140 likes | 251 Views
Geospatial World Forum 15 may 2013 Jaap Bakker Project Manager CB-NL. CB-NL CONCEPT LIBRARY FOR THE BUILT ENVIRONMENT. Content. Why we are developing a national concept library? CB-NL: What is it and how does it work? Questions and discussion. CB-NL.
E N D
Geospatial World Forum 15 may 2013 Jaap Bakker Project Manager CB-NL CB-NLCONCEPT LIBRARY FOR THE BUILT ENVIRONMENT
Content • Why we are developing a national concept library? • CB-NL: What is it and how does it work? • Questions and discussion
CB-NL Why we are developing a national concept library?
Why? Semantic misunderstanding
Why? Lifecycle or supply chain integration Costs Data growth Data quantity De-commision Goal Operate en maintain Construction Design Plan Time Data transaction
CB-NL What is it and how does it work?
What is an concept library? IFC/COINS CB-NL BIM
Use of the Concept Library Content of object is conform Specifier, Designer, Planner, Calculator, ... Create new, edit existing object
Semantic structure Arch bridge Fixed bridge Rail bridge Bridge Viaduct Spanning structure Crossing Underpass Node
Pilot Concept Library (buildings and infra) Infranea Dienst IVV Amsterdam Kawecon KWS Movares Royal Haskoning DHV Prorail Provincie Gelderland Rijksgebouwendienst Rijkswaterstaat Semmtech Smit's Bouwbedrijf STABU Strukton TNO TU Delft TU Eindhoven UNETO VNI Vicrea Wagemaker 2BA 3D Next Alterra Arcadis Ballast Nedam BAM BIM Omgeving Croon CROW Deltares Dienst Vastgoed Defensie DON Bureau Esquine ETIM FME Gemeente Rotterdam Geonovum GVB Infra BV Heijmans Ingenieursbureau Amsterdam Demonstrator
Hierarchy of Concept Libraries bSDD / INSPIRE Extension of Extension of Extension of Extension of
Just for BIM or does GEO know concepts to? Beam, cable, suspention bridge, bridge deck, reinforcement, concrete, etc. Cities, adresses, buildings, terrains, rivers, roads, etc.
Products CB-NL bij the end of 2014 • The CB-NL is a working and stable concept library with validate content; • The CB-NL is connected to existing initiatives • The CB-NL is a formally known open standard • The CB-NL is contractual required by public clients • Tooling is available • IFD V16 and COINS 1.0 are supported