Breaking Down Planning Barriers in the UK Gemma Grimes, BWEA

Breaking Down Planning Barriers in the UK Gemma Grimes, BWEA. 2. Overview. Background Planning Act: IPC NPS SIs Round-up: Outstanding Issues Other Planning Matters. 3. Background to New System. Lengthy Inconsistent Complex Challengeable. 13%. Targets for 2020. 4.

zamir
Download Presentation

Breaking Down Planning Barriers in the UK Gemma Grimes, BWEA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Breaking Down Planning Barriers in the UKGemma Grimes, BWEA

  2. 2 Overview • Background • Planning Act: • IPC • NPS • SIs • Round-up: • Outstanding Issues • Other Planning Matters

  3. 3 Background to New System • Lengthy • Inconsistent • Complex • Challengeable 13% Targets for 2020

  4. 4 Planning Act 2008 - Aims + Functions • Infrastructure planning should be: • Faster • More Consistent • Less Complex • Less Easily Challenged • New System Structure: • Infrastructure Planning Commission (IPC) • National Policy Statements (NPSs) • Detailed procedures + processes - statutory instruments (SIs) Places greater onus – through a new duty – on promoters to ensure that properly prepared and consulted on

  5. 5 Nationally Significant Infrastructure Projects IPC >100MW IPC >50MW MMO 1MW - 100MW TCPA <50MW Onshore Offshore

  6. 6 Infrastructure Planning Commission • Determining authority for NSIPs • Established late 2009 – advisory role • Fully operational late 2010 • Decision-making structure: • Panel Procedure Single Commissioner Procedure • Intervention by SoS

  7. 7 Infrastructure Planning Commission Decision-making process: • Pre-application phase Written reps Examination of apps Hearings • IPC Decision

  8. 8 National Policy Statements • Statement of Government Policy (SoS) • Form Policy Framework for IPC decisions • 12 NPSs are planned – 6 energy related Overarching Energy NPS Renewables Fossil Fuels Networks Gas + Oil …so where is the 6th?

  9. NPS Process 9 Scoping Report Environmental Report We are here 1a AoS/SEA Pre-scoping 1b AoS /SEA Post-Scoping 2 NPS drafting 3 Consultation Draft for Consultation End of 6 week JR window 4 Parliamentary Scrutiny 5 Consideration IPC takes first applications Including select committee process and any debates. 6 Lead-in time Publish Gov’t response & Designate NPS.

  10. Statutory instruments include… IPC Detailed structure + operation of IPC Guidance to IPC Guidance from IPC to applicants List of Statutory Consultees for applications NPSs List of Statutory Consultees for NPSs DCOs 10 Consultation process - SIs

  11. 11 SIs - Indicative Timeline Autumn ‘09 Spring ‘09 Autumn ‘10 Spring ‘10 Consultation Development & Drafting Consultation Revision/Redraft Applications Development & Drafting Consultation Revision/Redraft Environment Directive Development & Drafting Consultation Revision/Redraft Examinations Development & Drafting Consultation Revision/Redraft Decision framework Development & Drafting Consultation Revision/Redraft Fees Development & Drafting Consultation Revision/Redraft

  12. Confusion as to which piece of legislation takes primacy – NPS or PPS? Onshore projects <50MW – clustering? How fast will it be? Unknown relationship between WAG + IPC 12 Outstanding Issues-What is yet to be clarified?

  13. Marine Bill: MMO timetable for implementation unknown MMO will take on FEPA + CPA, as well as MCZs Weight of MPS Killian Pretty Review: National Policy on Development Management Local Financial incentives Aviation: BWEA + Industry working on a medium term commitment for developing solutions £10m programme 13 Other Planning Matters

  14. IPC: Infrastructure Planning Commission NPSs: National Policy Statements DCO: Development Consent Order NSIPs: Nationally Significant Infrastructure Projects MPSs: Marine Policy Statements MMO: Marine Management Organisation MCZs: Marine Conservation Zones 14 TLAs

  15. Gemma Grimes Planning Advisor, BWEA +44 (0)207 689 1936 gemma@bwea.com, or g.grimes@bwea.com 15 Thank youPlease contact me if you have any questions