550 likes | 861 Views
Rajasthan State Road Development & Construction Corporation Ltd. - Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road. BLG Construction Services (P) Ltd. AN ISO 9001-2000 CERTIFIED COMPANY FOR CIVIL ENGINEERING CONSULTANCY. Project Location. Gotan.
E N D
Rajasthan State Road Development & Construction Corporation Ltd. - Development of - Gotan-Pundlu-Borunda-Ransigaon- Khariameethapur-Bilara-Sojat Road BLGConstruction Services (P) Ltd AN ISO 9001-2000 CERTIFIED COMPANY FOR CIVIL ENGINEERING CONSULTANCY
Project Location Gotan Borunda Khejarla Bilara Sojat
Project Map Gotan Borunda Khejarla Bilara Sojat
Necessity of The Project This route Carries Heavy Mining and Industrial Traffic. A large number of lime, cement and chemical Industries nearly more than 100 are situated on this road. Besides this a large number lime stone quarries are also situated in the surroundings of this Road. The road caters for raw and finished lime product transportation. The area is agriculturally rich and improvement of this road will reduce the operation and maintenance cost of vehicles plying over this road.
Study Objective • Development of the road as two laning with paved shoulder or earthen shoulder. • Determining technical feasibility & financial viability. • Development & Construction of project highway with project facilities, enhanced safety & Level of services. • To ensure minimum adverse impact on local population, road users & environment . • Phased development of project highway for improving its financial viability with minimum inconvenience to traffic if additional work are undertaken within 7 years.
Work Done Till Date • Reconnaissance Survey Completed • Mobilization of Staff • 7 Days Traffic demand assessment and classified Traffic Volume count work completed, Intersection volume count completed, Pedestrian crossing completed. Axle load Spectrum completed. • Topographic, Alignment and Land use survey completed for 70km of project road. Bridge & road condition survey completed. • Geotech, material, hydrology, drainage survey in progress • Inspection of available records completed. • Land Plan survey under preparation. • Environment and social impact study in progress.
Project Description • Project Road is Road from Gotan to Sojat Via Pundlu – Borunda • Project Road is having total length of 93 Kms. • Project Road length is 23 KM in district Nagour. • Project Road length is 58 KM in district Jodhpur & 12 KM in Pali
Project Description contd.. Project Road passes through town villages as below : • Predominant land use is agriculture. • Structures are generally in good condition. • Minor bridges and pipe culverts shall have to be reconstructed / widened. • Flush Causeways will be replaced by Culverts. • Bypass at Ransigaon-Hariadhana and pundlu are proposed. • Construction of CC road in Borunda mining area and other water logged village portions.
Physical Features contd.. • Formation Width • Various from 10 M to 12 M • Carriageway Width • KM 0/0 – 22/0 5.5 M • KM 22/0 – 26/0 Kuccha/Damaged • KM 26/0 – 45/0 3.75 M • KM 45/0 – 53/0 5.5 M • KM 53/0 – 62/0 3.75 M • KM 62/0 – 63/0 7 M • KM 63/0 – 93/0 5.5 M • Crust Thickness • WBM - 150 MM • GSB - 300 MM to 230 MM • B.T. - 20mm PMC • CBR • 10.0%
Photos Starting Point at Gotan Pipe Culvert Kacha Track in Mining Area Borunda Flush Causeway Intersection at Dhanapa
ALIGNMENT THROUGH TOWN/VILLAGES The alignment passes through village Gotan-Pundlu-Borunda-Hariadhana-Ransigaon-Murkasni-Jhaak-Khariameethapur-Bilara-Barna and Atpada. Bypass is proposed at Ransigaon. Road Geometrics Improvement proposed near village Pundlu and at road from Pundlu to Borunda.
GOTAN TO BORUNDA N To Merta Total Length - 28KM Gotan To Merta RAM NAGAR Village Dhanapa Crossing To Jodhpur Pundlu Village Toll Plaza BasniSejan Crossing Borunda
Road Geometrics Improvement Existing Length = 850m PUNDLU Existing Length = 225m Proposed Length = 525m Proposed Length = 105m Existing Road Proposed Road
Road Geometrics Improvement Proposed Length = 515m Existing Length = 950m Existing Road Proposed Road
BORUNDA TO KHEJARLA BORUNDA (VIA: RANSIGAON) (LENGTH - 27KM) To MERTA To PIPAR N Toll Plaza HARIADHANA RANSIGAON To SH-21 To PIPAR To KHARIYA METHAPUR To GAHNAMAGARA VILLAGE KHEJARLA
RANSIGAON TO KHARIAMEETHAPUR (LENGTH - 20KM) MURKASNI RANSIGAON N JHAAK RIVER RIVER Toll Plaza UDALIYAWAS To JAIPUR NH 112 To JODHPUR NH 112 KHARIAMEETHAPUR
Proposed bypass at Ransigaon TO BORUNDA Existing Length = 2470m EXISTING TRAFFIC FLOW PROPOSED TRAFFIC FLOW Prop. Length = 1800m TO kHEJARLA RANSIGAON Existing Length = 3130m Prop. Length = 2500m TO KHARIAMEETHAPUR Existing Road Proposed Road
KHARIAMEETHAPUR TO BILARA To JAIPUR (LENGTH - 3KM) KHARIAMEETHAPUR N NH 112 To JODHPUR NH 112 To JAITARAN Bilara To SOJAT To NH-14
TO DEORIA VILLAGE BILARA TO SOJAT CHOPARA FEEDER TO HARSH VILLAGE Bilara BARNA (LENGTH - 30KM) N TO DEOLI KALAN Toll Plaza ATBARA TO CHITERYA VILLAGE RUNDIYA TO BOYAL MANDLA SH 62 SH 58 Toll Plaza RIVER Sojat NH 14 RIVER
Traffic Projections As per IRC-37:2001 7.5% increase in traffic per Annum As per Model Concession Agreement 6% increase in traffic per Annum For pavement design : CBR : 10% VDF : BUS 1.5 Truck 3.5 LCV 1.5 Hence for crust design purposes as per IRC-37:2001
Laning Requirement Capacity of 2 lane with earthen shoulder exhausting in year 2023 in respect of Borunda to Khariameethapur, in year 2025 in respect Bilara to Sojat and year 2030 in respect to reach from Gotan to Borunda hence to two lane with paved Shoulder will be required.
Toll Plaza RSRDC
Location of Proposed Toll Plazas • To make Toll realization realistic and to facilitate public of this area the entire road has been divided into 4 Toll Zones. • The Toll Plazas do not fall with in 10 Km Municipal Area • The Toll collected at one of the plazas will be verified at the other one.
Toll Realisation For Toll Realisation following exemption have been made Of the net Tollable Traffic 85% Toll realisation has been assumed in the project viability calculation.
Project Cost Repayment Project is viable