I-39/90 EXPANSION PROJECT Prefabricated Bridge Elements & systems: piers

8/8/13 Bill Dreher – WisDOT Structures Design Chief Bill Oliva – WisDOT Structures Development Chief. I-39/90 EXPANSION PROJECT Prefabricated Bridge Elements & systems: piers. Why Every Day Counts and ABC Technology?.

zarek
Download Presentation

I-39/90 EXPANSION PROJECT Prefabricated Bridge Elements & systems: piers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 8/8/13 Bill Dreher – WisDOT Structures Design Chief Bill Oliva – WisDOT Structures Development Chief I-39/90 EXPANSION PROJECTPrefabricated Bridge Elements & systems: piers

  2. Why Every Day Counts and ABC Technology? ABC is a paradigm shift in the project planning and procurement approach where the need to minimize mobility impacts which occur due to onsite construction activities are elevated to a higher priority.

  3. Types of ABC Technologies being used in Wisconsin • PBES - Prefabricated Bridge Elements and Systems • GRS-IBS - Geosynthetic Reinforced Soil – Integrated Bridge System • Lateral Slides • SPMT – Self Propelled Modular Transport

  4. PBES - Prefabricated Bridge Elements and Systems

  5. GRS-IBS- Geosynthetic Reinforced Soil – Integrated Bridge System

  6. Lateral Slides

  7. SPMTSelf Propelled Modular Transport

  8. ABC Decision-Making Matrix – Bridge Manual Chapter 7 - ABC

  9. ABC Decision-Making Matrix • Develop an initial score of applicability • Disruption (on/under bridge) • User Cost and Delays • Construction Time • Environment (mitigation) • Risk Management (Safety & Operation) • Other (Economy of Scale, Weather)

  10. ABC Decision-Making Matrix

  11. ABC Decision Making Flowchart

  12. Enter Flowchart Based on Score

  13. ABC Decision Making Flowchart

  14. What are Prefabricated Bridge Elements & Systems (PBES) and what are the benefits? • Strategic Highway Research Program (SHRP2) - Innovative Bridge Designs for Rapid Renewal (R04) • Prefabricated Piers

  15. Prefabricated Bridge Elements and Systems PBES is one of the Accelerated Bridge Construction (ABC) methods used to minimize impact to traffic, increase safety during construction, and minimize impacts in environmentally sensitive areas.

  16. Prefabricated Bridge Elements and Systems • One of the five major methods that FHWA has emphasized as accelerating technologies • Structural components of a bridge built offsite, or adjacent to the alignment • Reduces the onsite construction time and mobility impact timethat occurs from conventional construction methods.

  17. Prefabricated Bridge Elements and Systems Benefits • Reduced environmental impacts • Improved work zone & worker safety • Improved product quality: controlled environment, cure times, easier access, etc. • Lower initial and Life-Cycle Costs

  18. Prefabricated Bridge Elements and Systems Elements: single structural components of a bridge • Deck Elements • Beam Elements • Pier Elements • Abutment Elements • Miscellaneous Elements

  19. Prefabricated Bridge Elements and Systems Systems: • Entire superstructure – SPMT’s • Entire superstructure or bridge – lateral slides

  20. SHRP2 • TRB’s second Strategic Highway Research Program (SHRP 2): Innovative Bridge Designs for Rapid Renewal: ABC Toolkit • Describes standardized approaches to designing and constructing complete bridge systems for rapid renewals. • $300,000 allocated to the I-39/90 Expansion Project for prefabricated piers on 4 Dane Co. structures • Must be obligated by 9/26/13

  21. PBES - Piers • I-39/90 project staff interest • Pier shape – favorable for precast • Opportunity for repetition – re-use of forms • Save $ • Save time

  22. PBES - Piers I-94 N-S Corridor @ Rawson Ave. • Precast columns • Precast pier cap

  23. Prefabricated Bridge Elements and Systems - Piers

  24. Prefabricated Bridge Elements and Systems - Piers

  25. Questions???

  26. Next Steps • I-39/90 project schedule • SHRP2 schedule • Prefabricated Pier standards and specifications