Fuel Cell Design

Fuel Cell Design. Chemical Engineering Senior Design Spring 2005 UTC. Technical and Economic Aspects of a 25 kW Fuel Cell. Chris Boudreaux Wayne Johnson Nick Reinhardt. Technical and Economic Aspects of a 25 kW Fuel Cell. Chemical and Thermodynamic Aspects. Our Competence.

zarifa
Download Presentation

Fuel Cell Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fuel Cell Design Chemical Engineering Senior Design Spring 2005 UTC

  2. Technical and EconomicAspects of a 25 kW Fuel Cell Chris Boudreaux Wayne Johnson Nick Reinhardt

  3. Technical and EconomicAspects of a 25 kW Fuel Cell • Chemical and Thermodynamic Aspects Our Competence Investigate the design of --a 25 kW Fuel Cell --Coproduce Hydrogen --Grid parallel --Solid Oxide Electrolyte Not Our Competence

  4. Outline Introduction to the project Process Description Process & Equip. Design Economic Analysis

  5. Introduction Overall Reaction Methane + Air --> Electricity + Hydrogen + Heat + CO2

  6. Introduction Gas Reformer Water SynGas Electricity Air Fuel Cell Heat POR Hydrogen Pressure Swing Adsorption Exhaust

  7. Fuel Cell-Chemistry SynGas POR H2 + CO H2 H2O CO2 CO O- O- “Air” Air O2 N2 Solid Oxide Electrolyte is porous to O-

  8. Fuel Cell-Electricity Electrons SynGas POR H2 H2O CO2 CO Load O- O- “Air” Air O2 N2

  9. Fuel Cell-Challenges SynGas POR H2 Hot SynGas + CO H2 H2O CO2 CO Recover H2 O- O- “Air” Air O2 N2 Hot Air Recover Heat

  10. Process DescriptionTurn it over to Nick Reinhardt

  11. Process Description Fuel Preparation Fuel Cell Air Preparation Post Processing

  12. Fuel Preparation - 100 Fuel Preparation Fuel Cell Air Preparation Post Processing

  13. Air Preparation - 200 Fuel Preparation Fuel Cell Air Preparation Post Processing

  14. Fuel Cell - 300 Fuel Preparation Fuel Cell Air Preparation Post Processing

  15. Post Processing - 400 Fuel Preparation Fuel Cell Air Preparation Post Processing

  16. Process and Equipment DesignTurn it over to Chris Boudreaux

  17. Sulfur Purge 25°C 0.0002 kmol/hr H2S = 100% Desulfurizer Pure Natural Gas 25°C 0.33 kmol/hr CH4 = 100% Natural Gas Inlet 25°C 0.33 kmol/hr CH4 = 99.9% H2S = 0.001%

  18. Heat Exchangers • A=q/UFΔTlm • F = 0.9 • U = 30 W/m2°C • ΔTlm = (ΔT2 – ΔT1) / [ ln(ΔT2 / ΔT1) ]

  19. Fuel Humidifier POC Vent 26°C Pure NG 25°C 0.3 kmol/hr CH4 = 100% Humidified NG 273°C 0.67 kmol/hr H2O = 56% CH4 = 44% Area = 2.6 m2 q = 1.8 kW Recycled Water 5°C 0.37 kmol/hr H2O = 100% Cooled POC 283°C 3.51 kmol/hr N2 = 86% O2 = 9% H2O = 4% CO2 =1%

  20. Fuel Preheater POR 850°C 1.3 kmol/hr H2O = 47% H2 = 29% CO2 = 23% CO = 1% Humidified NG 273°C Area = 6.3 m2 q = 5.3 kW Heated HNG 840°C Cooled POR 479°C

  21. COMB-105 R-104 Reformer R-104 CH4 + H2O → CO + 3H2 CH4 + 2H2O → CO2 + 4H2 Depleted Air POC Pure NG SynGas Heated HNG q = 17 kW SynGas 734°C 1.26 kmol/hr H2 = 73% CO = 21% H2O = 3% CO2 = 2% Heated HNG 840°C 0.67 kmol/hr H2O = 56% CH4 = 44%

  22. COMB-105 R-104 Combustor COMB-105 CH4 + 2O2 → CO2 + 2H2O Depleted Air POC Pure NG SynGas Heated HNG q = -17 kW Pure NG 25°C 0.03 kmol/hr CH4 = 100% Depleted Air 850°C 3.48 kmol/hr N2 = 87% O2 = 11% H2O = 2% POC 784°C 3.51 kmol/hr N2 = 86% O2 = 9% H2O = 4% CO2 =1%

  23. Water Gas Shift Reactor CO + H2O → CO2 + H2 WGS Exhaust 480°C 1.26 kmol/hr H2O = 46.5% H2 = 30% CO2 = 23.2% CO = 0.3% Cooled POR 480°C 1.3 kmol/hr H2O = 47% H2 = 29% CO2 = 23% CO = 1%

  24. Fuel Cell Depleted Air 850°C 3.48 kmol/hr O2 = 11.5% CO + ½ O2 → CO2 H2 + ½ O2 → H2O SynGas 750°C 1.26 kmol/hr H2 = 73% CO = 21% H2O = 3% CO2 = 2% POR 850°C 1.3 kmol/hr H2O = 47% H2 = 29% CO2 = 23% CO = 1% Heated Air 650°C 3.88 kmol/hr O2 = 21%

  25. Pressure Swing Adsorber H Exhaust 25°C 0.38 kmol/hr H2 = 100% Air Inlet 25°C 0.13 kmol/hr Uncondensed Gases 5°C 0.68 kmol/hr H2 = 56% CO2 = 43% Purge 25°C 0.43 kmol/hr CO2 = 68%

  26. Economic AnalysisTurn it over to Wayne Johnson

  27. Economic Components • Capital Costs • Operating Costs • Income Generated • Payback Period • Return on Investment

  28. Capital Cost Assumptions • Cap Cost Program • Analysis, Synthesis, and Design of Chemical Processes • Compares to Peters and Timmerhaus • Stainless Steel

  29. Equipment Costs

  30. Lang Factor • Fluid Processing = 4.74 • Includes: • Construction material and overhead • Labor • Contract engineering • Contingency • Site development • $40,000 X 4.74 = $190,000

  31. Operating Costs • Fuel: 0.33 kmol/hr = 260,000 BTU/hr = 0.26 therms/hr • Tennessee Valley industrial rate = $7.70/therm • Labor included at site

  32. Income • Electricity = 25kW • Price = $0.10/kWhr • Hydrogen = 0.38 kmol/hr = .76 kg/hr • Tennessee Valley industrial rate = $11.64/kg

  33. Total Income vs. Expense

  34. Investment Results Non-discounted Payback = 2.4 Years Return on Investment = 41%

  35. Conclusions • Rate of return and payback period are interesting • Emerging technology means cost may decrease

  36. Questions for the Board • What areas require more detail? • What locations should be investigated? • Should we enlist an electro-chemistry team? • Should we enlist an electrical engineering team?