1 / 36

Convocation Center Athletic Training Room Re-design

Christine Davis Tarryn Hardgrove Becky Kalla. Convocation Center Athletic Training Room Re-design. Current Convocation Athletic Training Room. Current Convocation Athletic Training Room. Current Convocation Athletic Training Room. Current Convocation Athletic Training Room.

zavad
Download Presentation

Convocation Center Athletic Training Room Re-design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Christine Davis TarrynHardgrove Becky Kalla Convocation Center Athletic Training Room Re-design

  2. Current Convocation Athletic Training Room

  3. Current Convocation Athletic Training Room

  4. Current Convocation Athletic Training Room

  5. Current Convocation Athletic Training Room

  6. Current Convocation Athletic Training Room

  7. Current Taping/Rehabilitation

  8. NEW Taping

  9. Taping • Large space for athletic trainers to tape efficiently • Very close to door for easy access and good traffic flow • Taping bench has storage

  10. Current Rehabilitation

  11. NEW Rehabilitation

  12. Rehabilitation • Roughly 9.5’ x 41’ • Out of high traffic area • Wide doors for handicap and cart access, as well as equipment installation • Doors open into hallway so no interference with rehabilitation • About 20% of athletic training room

  13. Current Treatment

  14. Current Treatment

  15. NEW Treatment

  16. Treatment • 7 treatment tables • Adequate space to various forms of treatment • Easily accessible for injured athletes • Outlets with GFIs • Tables contain storage area underneath • Sinks close to hydrotherapy room to share plumbing

  17. Current Convocation Athletic Training Room

  18. Current Convocation Athletic Training Room

  19. Current Hydrotherapy

  20. Current Hydrotherapy

  21. Current Hydrotherapy

  22. Current Hydrotherapy

  23. Current Hydrotherapy

  24. NEW Hydrotherapy

  25. Hydrotherapy • Room 17’ x 16’ • Easy entrance and exit • Door opens inward so no interference with rehabilitation • Clearly visible with large windows • 2 Ice machines • High outlets with GFI in case of flooding • Refrigerator • Wall drain • Back wall is plastic and water-proof • Cold Pool 71’ x 81’ • Roughly 16% of athletic training room

  26. Current Convocation Athletic Training Room

  27. Current Convocation Athletic Training Room

  28. Current Bathrooms

  29. NEW Storage

  30. Storage • About 14’ x 15’ • Away from hydrotherapy in case of flooding

  31. Current Offices

  32. NEW Offices

  33. Offices • Roughly 14’ x 16’ • Large windows for clear visibility and supervision over all areas of facility • Limited and secure access to medical documents

  34. Demolition • Tearing down all walls, doors, and ceiling • Removing carpet and tile flooring • Taking out whirlpool/cold tub • Total Estimated Cost : $17,843

  35. New Construction • 1752 square feet • Large windows for supervision • Wheelchair accessible • Open Rehabilitation Area • Estimated Costs $139,964

  36. New Construction