An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis of main disturbances at Elettra (A. Pozzer) -------------------------------------------------------------------------------------------------

  2. Trieste Sinchrotronvery sensitive Voltage Sags Voltage Peaks UPS does not for ALL DEVICES

  3. Disturbances PS or RF Plants off BEAM LOSS • What can we do? Analysis on the electric system with instruments “Equa” Signals acquired by Equa: -3 phases at 380V rms nominal -1 E-beam current in SR

  4. EQUA Parameters set up: -min voltage rms level 360V -max voltage rms level 420V -max voltage peak level 630V If one or more phases exceed the limit Equa records the event 100mS pre-triggers and 900mS post-triggers

  5. B E A M LOST 3 phases min rms E-Beam current SR starting event voltage Sag A Voltage Sag on three phases caused the lost of beam

  6. All the runs since 2000 Period June 2004 – August 2005 • the events withvoltage RMS level • the events with voltage PEAK level

  7. Events with MIN and/or MAX voltageRMS level beamloss Tot 112 events 32 of them Events distribuition in the course of the seasons

  8. events with Beam Loss summer summer summer First Consideration: the most difficult period at Elettra is certainly the summer season for the presences of thunderstorms.

  9. Duration – Depth a) – events with duration < 200mS 26 events E- Beam current Voltage Sag

  10. These limits have been observed:

  11. b) - events with duration > 200mS 6 events These limits have been observed:

  12. E – beam SR Voltage Sag BEAM LOSS 1) Duration: 500mS - Depth: 8.20%

  13. 2) Duration: 500mS - Depth: 5.30% NO BEAM LOSS E – beam current SR Voltage Sags Depth Events < 5% are not considered

  14. Events with MAX voltagePEAK level Working day in the morning A Voltage Peak SR in normal condition NO problem Voltage Peak E-beam currente SR

  15. But If ... SR is in a particular condition BEAM LOSS 3 events BEAM LOSS Always during the Ramping and with E- Beam current > 300mA

  16. Example: E-beam currente SR Voltage Peak

  17. Conclusion: • VOLTAGE PEAKS NO big Problems • future? With new Booster? • VOLTAGE SAGS NOT OK - too many Beam Losses HOPE U P S All Devices

  18. References: Effects of mains disturbances on the Elettra operation (R. Visintini – Accelerator Sector Technical Meeting -May,6th 2002)