1 / 9

ORDER 450.1 ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP

ORDER 450.1 ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP. ENVIRONMENTAL MONITORING JAMES BACHMAIER 202-586-0341 james.bachmaier@eh.doe.gov. EMS APPROACH TO MONITORING. OA REPORT ON ENVIRONMENTAL MONITORING SURVEILLANCE AND CONTROL PROGRAMS AT DOE

zelaya
Download Presentation

ORDER 450.1 ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ORDER 450.1 ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP ENVIRONMENTAL MONITORING JAMES BACHMAIER 202-586-0341 james.bachmaier@eh.doe.gov

  2. EMS APPROACH TO MONITORING • OA REPORT ON ENVIRONMENTAL MONITORING SURVEILLANCE AND CONTROL PROGRAMS AT DOE • SUCCESSFULLY ADDRESS REMEDIATION OF EXISTING CONTAMINATION • EXPECTATIONS NOT CONSISTENTLY UNDERSTOOD • INSUFFICIENT RESOURCES APPLIED TO ENVIRONMENTAL MONITORING

  3. EMS APPROACH TO MONITORING • ORDER DOE 5400.1, CHAPTER IV • FRAMEWORK FOR EMS GUIDANCE • EFFLUENTS/EMISSIONS • PRE-OPERATIONAL • METEOROLOGICAL • ENVIRONMENTAL SURVEILLANCE (AIR, GROUND WATER, ETC.)

  4. EMS APPROACH TO MONITORING • ALL MONITORING INTEGRATED • MONITORING NETWORK(S) DESIGNED FOR SPECIFIC DATA NEEDS • NETWORKS OPTIMIZED REGULARLY • EMPHASIS ON LONG-TERM • MONITORING DETERMINED BY PROGRAM NEEDS ASSESSMENTS

  5. CRITERIA FOR OPTIMIZING SITE-WIDE MONITORING • PROVIDES QUANTITATIVE SUBSURFACE QUALITY DATA FOR RESOURCE MANAGEMENT • PROVIDES SPECIFIC GW QUALITY DATA F0R REGULATORY COMPLIANCE

  6. CRITERIA FOR OPTIMIZING SITE-WIDE MONITORING • MAINTAINS DOCUMENTATION OF SIZE AND SCOPE OF SITE-WIDE PROGRAM • DESIGNS NETWORKS FOR EACH SPECIFIC PURPOSE • ENSURES EFFICIENCY AND COST-EFFECTIVENESS • ENSURES THAT DATA MEETS USERS NEEDS

  7. CRITERIA FOR OPTIMIZING SITE-WIDE MONITORING • INCLUDES PROCESSES FOR CONTINUOUS IMPROVEMENT • INVESTIGATES ALTERNATIVE METHODS • ANALYZES TRENDS IN ENVIRONMENTAL QUALITY • ENSURES DATA COMPARABILITY

  8. GW MONITORING PROGRAM ELEMENTS • SAMPLING/ANALYSIS PLANS • SURVEILLANCE NETWORK • CONTINGENCY PLANS • SITE-WIDE VULNERABILITY ASSESSMENT PROCESS • SUBSURFACE CHARACTERIZATION PROCESS

  9. GW MONITORING PROGRAM ELEMENTS • PRIORITIZATION SYSTEM • DATA MANAGEMENT/REPORTING SYSTEM • WELL MAINTENANCE PLAN • WELL ABANDONMENT PROCEDURES • QA/QC PROCEDURES • EXTERNAL PEER REVIEW PROCESS