1 / 5

IRS C hip T esting Report 09/09/2010

IRS C hip T esting Report 09/09/2010. Chih-Ching Chen a nd Chiu-Chuan Ming -Yuan. status of the tests we discussed in Hawaii. Find a data value set for testing Replace a new IRS chip Voltage cal. Storage access testing for all 32K (ongoing) Will do:

zena-smith
Download Presentation

IRS C hip T esting Report 09/09/2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRS Chip Testing Report09/09/2010 Chih-Ching Chen and Chiu-Chuan Ming-Yuan

  2. status of the tests we discussed in Hawaii • Find a data value set for testing • Replace a new IRS chip • Voltage cal. • Storage access testing for all 32K (ongoing) Will do: • Sample timing calibration for one channel • Sampling timing calibration by Avtech pulse • Change CMPbias resister

  3. Replace a new IRS

  4. testing details and difficulties • The CH0-CH2 signal are bad after 64 sampling points in new IRS chip. New TSA value?

  5. questions • The IRS testing board layout file

More Related