1 / 9

FIDIBE – WP6 Results and future challenges

FIDIBE – WP6 Results and future challenges. Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary. Overview of the WP6 / 1. Aim of the WP 6/1 is to ensure the sustainability and capitalization of the project results .

zena
Download Presentation

FIDIBE – WP6 Results and future challenges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FIDIBE – WP6Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

  2. Overview of the WP6 / 1 Aim of the WP6/1 is to ensure the sustainability and capitalization of the project results. • continuing the transnational cooperation after the project ends: two Future Cooperation Schemeshave been prepared under the workpackage lead by TP L, Mentoring scheme Training and development Incubator Management of the commontool (finance) / teams virtual application

  3. Overview of the WP6 / 2 • Aim of the WP6/2is preparation of the Deed of Foundation of the SEE Innovative Business Parks Association. • sharing best practices, collaborating on project opportunities and discussing new policies for improving innovation environment • open to newmembers

  4. Overview of the WP6 / 3 • Aimis to ensure sustainability of the project’s resultsand „selling” them to the EU funding operations • Updating and upgrading national / regional / local list of stakeholders • Desk analysis of national / regional / local programmes, strategies that would support results and ensure the sustainability of FIDIBE results project • Proposal for national / regional / local policy improvement – elaboration for stakeholders

  5. Impact of the FIDIBE on TP LJ future challenges Development of the new cluster in the medical sector and construction building (Feasibility Study – WP5 Result)

  6. Why to support new pillar? • Trend in TPs all over the globe: ICT, Life Sciences, Biotechnology • 30 resident companies in TP LJ operating in medicine/biotechnology • Lack of networking and supporting services for companies in the sector with potential for growth • Idea well accepted among regional actors

  7. Concept • utilization concept for a further expansion of the medical supply offers has been placed Principle of a life- science research centre included in the future plans

  8. Invesment F1/1€15,000,000.00 Research centre: €43,000,000.00 Laboratories: €12,500,000.00 Sum of investment in total €70,500,000.00 TPLJ in 2011 9 employees 300 resident companies 41.000 m2 office spaces, 27.000 m2 servicesurface, 8 buildings, multisector park, TPLJ in 2025 12 employees 400 resident companies 120.000 m2 office spaces, 14 buildings, segmented park, gateway and landing destination for talents

  9. Thank you e-mail: marjana.majeric@tp-lj.si Tehnološki park 19, Ljubljana Phone: +386 1 620 34 00 Fax: +386 1 620 34 09 www.tp-lj.si/en

More Related