An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Raccoon Mountain Team Hydrogen Production Proposal 4-22-98

    2. Outline Problem Statement Flow Diagram Material Balance Equipment Design Economic Analysis Final Proposal

    3. Problem Statement To design a plant which produces a required amount of hydrogen while minimizing costs and waste streams. (Rev.3//2-26-98)

    4. Flow Diagram

    5. Flow Diagram

    6. Material Balance (Target)

    7. Equipment Design

    8. Economic Analysis Reactor 100K gal. stainless steel $215,000

    9. Economic Analysis Hi Temp Shift Tank 100K gal. stainless steel $175,000

    10. Economic Analysis PSA System Tank (5) 500 gal. stainless steel (300psi) $245,000

    11. Economic Analysis Storage Tank (2) 50K gal. 304 stainless steel $120,000 Heat Exchangers (2) 304 Stainless steel w/.75” ODx1in. 1000ft2 area $35,000

    12. Economic Analysis

    13. Economic Analysis Running Total $1,580,000 (Direct Plant Costs) Engineering/Sup. (32%) $253,000 Construction (34%) $269,000 Subtotal $2,102,000 (Direct and Indirect Costs) Contractor’s Fees (5%) $105,000 Contingency (10%) $210,000 Fixed Capital Investment $2,417,000

    14. Economic Analysis COSTS $3.50 / 1000cu.ft Natural Gas $0.45 / 1000gal. H2O $0.0758 / kwh Electricity PROFITS $0.40 / 100cu.ft Hydrogen Gas Carbon Monoxide Carbon Dioxide

    15. Economic Analysis Fixed Capital Investment $2,417,000 Estimated Monthly Expenses $9,213,000 Estimated Monthly Profit $9,732,000 Estimated Yearly Profit $6,228,000 Estimated Recovery Period 10 months Proposal

    16. Economic Analysis

    17. Conclusion