1 / 7

Regional PDP Report

Regional PDP Report. Einar Bohlin. Proposal topics at all 5 RIRs. Total. Q2 2010 (35) Q4 2010 (32) Q2 2011 (50) Q4 2011 (52 ) Q2 2012 (29). Draft Policies. Unique to the ARIN region: ARIN-2011-7: Compliance Requirement ARIN-2012-3: ASN Transfers

zinnia
Download Presentation

Regional PDP Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional PDP Report Einar Bohlin

  2. Proposal topics at all 5 RIRs Total Q2 2010 (35) Q4 2010 (32) Q2 2011 (50) Q4 2011 (52) Q2 2012 (29)

  3. Draft Policies • Unique to the ARIN region: • ARIN-2011-7: Compliance Requirement • ARIN-2012-3: ASN Transfers • ARIN-2012-4: Return to 12 Month Supply and Reset Trigger to /8 in Free Pool

  4. ARIN XXIXDraft Policies A = Adopted D = Discussion

  5. Highlights at the other RIRs • IPv4 • Proposal: Inter-RIR IPv4 Address Transfers (RIPE) • IPv6 • Proposal: Removing multihoming requirement for IPv6 portable assignments (APNIC) • WHOIS • Proposal: Registering assignments (LACNIC)

  6. References

  7. Thank You

More Related