An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recommended Practices

  2. Module Objectives • Summarize safe operating practices for LEOs working in WZ

  3. AboutRecommended Practices • Not requirements, but recommendations • Few specific standards/guidelines exist • None in the MUTCD • Every case is different! • Use your judgment!

  4. Recommended Practices • BEFORE the WZ starts • On ARRIVAL at the WZ • While at the WZ • Stationary operations • Moving operations

  5. 1. BEFORE the WZ Starts • Attend the pre-construction conference, if possible • Familiarize yourself with the project • Identify your point of contact • WZ Supervisor • Project Engineer • Who is responsible for the project?

  6. 2. On ARRIVAL at the WZ • Be early! • 15-minute rule • Contact your point of contact • Identify your role and safest location • Gather information about the project • Drive through the WZ • Note signs in the advance warning area • Identify possible relocating procedures

  7. 3. WHILE in the WZ • Be alert! • Be visible! • Be in contact! • If applicable, face traffic! • Pay attention to queues that may form and relocate as necessary • Contact your POC if adjustments are needed

  8. 3A. Stationary Operations • On the shoulder • Not in buffer space • Relocate as needed based on traffic condition • ¼ mile behind the end of the queue

  9. 3B. Moving Operations • The work zone moves continuously! • So should you! EXAMPLES are paving, striping, rumble strips, milling operations, etc.

  10. 3B. Moving Operations • Your position will change • May have to move in reverse on the shoulder • This may not be feasible if moving “fast” • REMEMBER: • Your role is PRESENCE • You are not a crash attenuator!

  11. ¼ mile ¼ mile On the shoulder, facing traffic!

  12. Module Recap • What are some of the recommended practices when working in a work zone? • Before? • During?