Opening of LC for UI default

Opening of LC for UI default CERC in their order on Petition No.172/ Suo-motu /2012 dt.27.07.2012 has directed the following utilities to show cause by 14.09.12 why Section 142 of Electricity Act 2003 should not be taken against them for not opening LC as per clause 10.4 of UI regulation

ziya
Download Presentation

Opening of LC for UI default

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Opening of LC for UI default CERC in their order on Petition No.172/Suo-motu/2012 dt.27.07.2012 has directed the following utilities to show cause by 14.09.12 why Section 142 of Electricity Act 2003 should not be taken against them for not opening LC as per clause 10.4 of UI regulation KudamkulamRs.62 Lakhs MeenakshiRs.7 Lakhs Simhapuri Rs.9.18 Lakhs Tamilnadu Rs.27.84Cr ( TN opened LC for Rs.5Cr only in lieu of Rs.32.84Crs) Meanwhile Simhapuri (SEPL) and Meenakshi(MEPL) opened LC for Rs.9.18Lakhs and Rs.7Lakhs respectively.

More Related