DCB Activities still many drafts, successive approximations

DCB Activities still many drafts, successive approximations. Peter H. Garbincius January 20, 2006 – KEK DCB_KEK_060120.ppt. contents:. Preliminary WBS (in SLAC format) slice by Area Sys. or Tech/Global Sys. WBS Guidelines: elements, dictionary, BoE

zofia
Download Presentation

DCB Activities still many drafts, successive approximations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCB Activitiesstill many drafts,successive approximations Peter H. Garbincius January 20, 2006 – KEK DCB_KEK_060120.ppt

  2. contents: • Preliminary WBS (in SLAC format) slice by Area Sys. or Tech/Global Sys. • WBS Guidelines: elements, dictionary, BoE e.g. TESLA Budget Book & WBS Dictionary, CFS Draft WBS matrix, CFS Config-USLCTOS • Draft Questions for Area System groups • Draft outline of RDR document • Current CFS layout sketches • Interactions DCB  Area, Tech, Global Sys • DCB’s working schedule => converge!

  3. WBS from Wilhelm – 16jan06nearly same as TESLA Budget Book + RTML

  4. Open e- Injection System (didn’t show labor)

  5. Open e+ Linac

  6. EXCEL example – use pointer to sort by Area Systems

  7. use pointer to sort by Technical & Global Systems

  8. Run through some preliminary documents and guidelines – 1(X to close .pdf) Draft WBS Guidelines http://lcdev.kek.jp/GDE/ASL2006KEK/1_Draft_WBS_Guidelines_PHG_060116.pdf TESLA Budget Book & WBS dictionary http://home.fnal.gov/~peterg/ILCDCB/2_TESLA_Budget_Book_and_WBS_dictionary.pdf Draft CF&S WBS Matrix vs. Area Sys. http://home.fnal.gov/~peterg/ILCDCB/3_CFSDRAFT_WBS-20060119.pdf

  9. Run through some preliminary documents and guidelines – 2(X to close .pdf) CF&S Criteria form from USLCTOS http://home.fnal.gov/~peterg/ILCDCB/4_CFS_CRITERIA_CONFIGURATION_LIST.pdf Draft questions for Area System Groups http://home.fnal.gov/~peterg/ILCDCB/5_Input_Area_Systems.pdf Draft format and contents for RDR book http://home.fnal.gov/~peterg/ILCDCB/6_Draft_RDR_outline_PHG_060116.pdf

  10. immediate DCB needs • Expand the levels of WBS are they logically consistent, optimal? • Define level of detail for each system don’t go too deep, but will need appropriate depth to produce cost estimate Tor’s 1% for each element (~ $ 50 M) seems about right scale TESLA TDR had ~600 active L5 elements • Define production model for high tech items - how many vendors/regions & distribution?

  11. Gerry Aarons (CFS for Fred Asiri) 18jan06drawing includes 1 TeV configuration from

  12. from Gerry Aarons (CFS) - 18jan06

  13. DCB working schedule => converge! • get feedback from you today, tomorrow… • another pass through DCB @ tonight’s call • by Monday night, forward these preliminary documents to Area, Global, and Technical System leaders • Cost Engineers: will concentrate on formulation of WBS working with Systems Groups

More Related