Discussion on TE/CRG equipment at H4IRRAD Marco Pezzetti (A. Tovar – B. Ivens / Support CE for cryo LHC) & TE-CRG-OA – TE-CRG-CI TECRGCE M.PEZZETTI
Discussion on TE/CRG equipment at H4IRRAD: - SEU Summary2011/2012 - AMB introduction - SEU signature protocol on AMB - Discussion on possible November 2012 test at H4IRRAD TECRGCE M.PEZZETTI
SEU: summary 2011-2012 Actions @ Xmas, not bad! QURCB_P8: 3x QURA_P4: 1x QUI_P4 : 1x QURCB_P6: 1x Courtesy A. Suraci TE-CRG-OA
Actions @ Xmas, not bad! • Relocation during Xmas 2011 • P8: QURCB electrical cabinets & CPU of QURA • P6: CPU’s of: QUI, QURA, QURCA & QURCB • P4: CPU’s of: QUI, QURA, QURCA, QURCB, QURCACC & QURCBCC
TE/CRG equipment - AMB introduction TECRGCE M.PEZZETTI
TE/CRG equipment - AMB introduction TECRGCE M.PEZZETTI
LINDE IHI QURC Layout TECRGCE M.PEZZETTI
(27/08/2012) P4 SEU signature… Rebooting (20s)…
SEU signature protocol… TE/CRG technicalprocedure for SEU signature identification: 1) Trend analyzing(20 s reboot) 2) AMB Test on TECRGCE test bench 3) Manufacture electronicstressingtest In accord with TE/MPE (F. Formenti). TECRGCE M.PEZZETTI
QURCs- AMB UX45 localisation PLC Siemens & Profibus network TECRGCE M.PEZZETTI
QURCs- AMB UX45 localisation PLC Siemens & Schneider TECRGCE M.PEZZETTI
QURCs- AMB UX45 localisation AMB & VFD TECRGCE M.PEZZETTI
Discussion on possible November 2012 test at H4IRRAD. No radiation for CCS cartouche. H4IRRADarea test TECRGCE M.PEZZETTI
R2E strategy for P4? -Blindage -Delocalisation <20m -Delocalisation >20m
SEU: Balance 2011-2012 • Number of weekswith Stable Beam > 640 bunches: • 20112012 • ~23 weeks ~15 weeks 640 bunches TS TS TS TS TS TS TS Courtesy A. Suraci TE-CRG-OA
SEU: Balance 2011-2012 • Actions taken to improverobustness: • CV891: automatic reset implemented into PLC (action: cut off 24 Vdc). • TT89x: modification of electronics card (capacitor removed), timer • PLC: moved into better protected zone (P4-P6-P8 caverns) • 24 Vdc: longer term, to be moved into a safer protected zone and better distribution of power consumption to be done. • AMB (Magnetic bearing controlers): relocation 2nd unit of P8 (Phase III), additional shielding required? Courtesy A. Suraci TE-CRG-OA
R2E P8 Ph 3 Relocation, long and complex project well prepared a success!!
QURCs- AMB UX45 localisation 20 m maximum… TECRGCE M.PEZZETTI
R2E- P8 Ph3 P8 QURCB Transfert US85 to UL84 QURCB-EMC4 QURCB-EMC3 QURCB-EMC2 QURCB-EMC1 QURA-Existing Schneider Cab. +Turbines cab.-NewLocation Caverne UX85 1 Cables 24VDC I/O depuis rack 24VDC US851 22 specific Cables controle depuis Blocs Phoenix QURCB-EM01=US85 2 Cables NE48 vers PLCSiemens + 1 cable NE18 QURCB-EM02=UL84 QURCB-Schneider New Cabinet QURCA-EM02=UL84 3 Cables Profibus PA QURC_QUI-EM03=UL84 24 Cables NE8 2 Cables Ethernet depuis Start Point US851 UJ84 QUICC-EM02=UL84 8 NE48 Cables controle from QURC-EMC1 to EMC4 QURCA/B&QUICC Valves Positionners Racks CCS Cabinet QURCA QURCA-EMC4 QURCA-EMC3 QURCA-EMC2 QURCA-EMC1 Realisation new chassis Blocs Phoenix UL84 US851 QURCB-EM01=US85 12 Cables CCS 24VDC/230VAC UPS /400VAC Longueur cables US852 a US85 CCS: 20m Longueur cables de US852 vers UJ84: 70 a 75m Longueur cables Armoires CCS US85 vers UJ84: 40 a 45m US852 Cold Compressors 12 specific Cables Compr. Froids Partie elec Vannes CV + 8 EV CCS Cabinet QURCB US85 Existing cabinets from US852 new location 22