Master the Art of Using Cementing Plugs

Cementing Plugs helps solving such problems especially for the petroleum industry globally and can occur at any moment of the well’s life cycle.

Download Presentation

Master the Art of Using Cementing Plugs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Master the Art of Using CementingPlugs Cementing operations are one of the most detailed works which requires complete attention regarding well integrity. Since it is a critical job, it requires a lot of research largenumberofoperations the years andthe but yet it during faces after helps throughout integrity cementing and Plugs problems, jobs. Cementing solving such problems especially for the petroleum industry globally and can occur at any moment of the well’s lifecycle.

  2. Well integrity issues categorized according to the moment at whichhappens: • Whilethecementdisplacement wellbore • After the cementplacement • After the cement has beencured in the During the period between 1992 and 2006, the leading cause for blowouts was cementing. The first category results in veryseriouswell-control problems including blowouts. These problemsfirstly

  3. occurbecauseoftheimproperdesignof thecementingoperations hydrostatic pressure of anddueto thecement slurries. The failure during the process of mixing slurries obtains the desire density and lost circulation during the cement displacement. In the second category, the loss of hydrostatic pressure of the cement slurries causes problem during the initial hydration period. The problems may rise because of the mismanagement. It can cause pressure build up in the annulus between the casing zonalisolation,we-control theremedialsolutionsfor stringsand problems and this are normally expensive anddifficult.

  4. In the third stage, the problems that occur are more long-term normally caused by poor cementing jobs. Defective drilling mud removal during the cement slurry displacement in the annulus, insufficient cement height that may lead to casing leakage and corrosion problems are some of the causes. Cementing Plugscan contribute to long-term well integrity failures, otherwise, the cost to fix these problems are highlyexpensive.