An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Status UpdateP09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)

  2. Project Status Update • Project Name • Process Improvement Project • Project Number • P09457 • Project Family • Sustainable Technology for the Global Market • Track • Process Improvement Innovations • Start Term • 2008-2 planned academic quarter for MSD1 • End Term • 2008-3 planned academic quarter for MSD2 • Faculty Guide • Professor John Kaemmerlen • Faculty Consultant • Dr. Kuhl, choice for simulation • Faculty Consultant • Dr. Carrano, choice for manufacturing processes • Primary Customer • Dresser-Rand with the point of contact being Dennis Rice at the Olean facility

  3. Mission Statement • The mission of the Process Improvement Project is to implement lean principles into the piping and packaging line at Dresser-Rand Corporation’s Olean facility. • Goal: reduce cycle time by 30%. • Approach: improve the flow of products, warehousing of parts, visual controls, and reduce the waste within the line.

  4. Current Layout Test Assembly Piping Assembly & Packaging Parts

  5. Customer Needs • Reduce Cycle Time • Improve Flow of Product • Visual Controls System • Standardize Work Processes • Accurate Drawings • Free Up Floor Space • Maintain High Level of Safety

  6. Staffing Requirements

  7. Work Breakdown Structure P – D – C – A

  8. Work Breakdown Structure

  9. Risks and Constraints • Risks • Quality – Tradeoff of quality vs. speed • Worker resistance to change • Disruption to other processes • Increased cost to production • Constraints • Factory distance (Olean plant 2 hour drive) • 22 week improvement period • Cameras not allowed in facility • D-R staff availability

  10. Resources Required

  11. Deliverables • Current State Value Stream Map • Future State Value Stream Map • Detailed Current State Layout • Future State Layout • Factory CAD Drawings and Analysis • Simulation Models and Analysis • Cost-Benefit Analysis • Visual Control System

  12. Team Values