1 / 10

We Apologize for the Road Construction!

We Apologize for the Road Construction!. It Really will Make Things Better When it’s Finished!. Until Then – Just use t his Easy Way to Reach Us!. Turn West on Carmel Drive Stop Light Intersection - Hamilton Crossing Shopping Center is on South-east corner. Go through Roundabout

zuri
Download Presentation

We Apologize for the Road Construction!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. We Apologize for the Road Construction!

  2. It Really will Make Things Better When it’s Finished!

  3. Until Then – Just use this Easy Way to Reach Us!

  4. Turn West on Carmel Drive Stop Light Intersection -Hamilton Crossing Shopping Center is on South-east corner

  5. Go through Roundabout Carmel Drive turns into Illinois Street Just stay on Illinois Street

  6. At 136th Street Roundabout Turn Right onto 136th Street Beeson Cosmetic Surgery is 100 Yards on Your Right!

  7. Some Detours can be Confusing!

  8. But This Detour is Easy!

  9. And if you have any problems – just call us at 317-846-0846 and we’ll guide you through!

  10. THANK YOU !

More Related