1 / 5

South King & Pierce Cooperation

South King & Pierce Cooperation . Cooperative Objectives. Comply with standards WAC 296-800-16005, 10 & 15 WAC 296-305-02001 NFPA 1851 Optimize PPE performance within budget constraints Establish an evidence-based standard Drive reform in turnout manufacturing. Historical.

zuriel
Download Presentation

South King & Pierce Cooperation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. South King & Pierce Cooperation

  2. Cooperative Objectives Comply with standards WAC 296-800-16005, 10 & 15 WAC 296-305-02001 NFPA 1851 Optimize PPE performance within budget constraints Establish an evidence-based standard Drive reform in turnout manufacturing

  3. Historical

  4. Phase One “User Satisfaction” • Break In • Primary Set • Real incidents/drills • One “month” operations • Secondary Set • Ten specified workouts • Evaluations • 20 Dimensions each for coat and pants • Summarized as a percentage of satisfaction 74%

  5. Phase Two “Head to Head” • Six CPAT-based stations executed in all turnouts sequentially • Tailboard step • Stairclimb • Ceiling pull • Crawl • Lift and drag • Ladder manipulation Choose the highest performing ensemble.

More Related