1 / 22

Table of contents

Table of contents. General Information about the MERO-TSK Group Production Facilities Floors Calcium Sulphate panels Chipboard panels Substructure Floor covering References. General information on the MERO-TSK Group. MERO-TSK International GmbH & Co. KG

zuzela
Download Presentation

Table of contents

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Table of contents General Information about the MERO-TSK Group Production Facilities Floors Calcium Sulphate panels Chipboard panels Substructure Floor covering References

  2. General information on the MERO-TSK Group MERO-TSK International GmbH & Co. KG Max-Mengeringhausen-Str. 5, 97084 Wuerzburg, Germany Phone Construction Systems +49 (0) 931 6670-0 Floor Systems +49 (0) 9383 203-0 Exhibit Systems +49 (0) 931 6670-0 Fax Construction Systems +49 (0) 931 6670-409 Floor Systems +49 (0) 9383 203-602 Exhibit Systems +49 (0) 931 6670-568 Web http://www.mero-tsk.de Email info@mero.de Legal Form GmbH & Co. KG Foundation 18.11.2004 Registration HRA 5575 Personally Liable MERO-TSK Würzburg Beteiligungs-GmbH Partner Registered Office, Register Court Wuerzburg HRB 8594 Managing Director Guenther Troester

  3. General Information Construction of space frames, glazed structures, facades, aircraft maintenance docks, steel and light constructions, production, distribution and installation of MERO access floors, MERO hollow floors, MERO exhibition systems. 100% of all assets of MERO were taken over by the Troester Family in October 2004. The corporate history dates back to 1928, when Dr.-Ing. h.c. Max Mengeringhausen opened the first German engineering office for prefabricated systems in Berlin. In 1948 he moved the company to Wuerzburg. Average Personnel 350 employees Turnover 2000 2001 2002 2003 EUR 131.000.000,-- EUR 128.000.000,-- EUR 161.000.000,-- EUR 153.000.000,-- incl. Subsidiaries 2000 2001 2002 2003 EUR 210.000.000,-- EUR 235.000.000,-- EUR 265.000.000,-- EUR 239.000.000,--

  4. Chipboard panels • high density chipboard • with edge trim • thicknesses 22 mm, 30 mm and 38 mm • with aluminium foil or steel sheet on bottom • application of different kinds of coverings

  5. 2 3 1 4 Raised Floor with Parquet 1. Panel 2. Parquet 3. Edge trim 4. Aluminium foil / Steel sheet Possible Panels • high density chipboard panels • calcium sulphate panel

  6. Building material class B acc. to DIN 4102 • Fire resistance class F 30 Characteristics • panels meet the E1 requirements with regard to formaldehyde emissions • Easy handling on site • Dimensional accuracy

  7. Calcium Sulphate panels • thicknesses from 13 mm to 42 mm • with and without edge trim • with and without steel sheet on bottom • with and without aluminium foil • application of different kinds of coverings

  8. Non-combustible building material class A acc. to DIN 4102 • Fire resistance class F 60 Graph • High bearing capacity • Very low deflection Characteristics • Dimensional accuracy • Very low hygroscopic behaviour • Excellent acoustic values • Very good walking comfort • Easy handling on site • Environmental friendly material

  9. 3. Customized solutions . 1. Any possible panel thickness 2. Variable composition of raw materials

  10. Substructure Pedestal • Type M12, M16 and M20 • galvanized • yellow chromatized • (additional protection against corrosion) • adjustable • high precision tube

  11. Stringers Stringer type U Stringer type M Stringer type C Function: • can be hinged in from above • Tight connection • Optional screwing possibility, however not neccessary from a technical point of view • increase lateral stability and of point load

  12. System view

  13. PVC • Linoleum • Caoutchouc • Carpet • Needlefelt • Velour • Ceramic • Nature and artifical stone Floor covering • HPL Coverings • Parquet

  14. We have an excellent long term experience with the following Floor Covering Manufacturer • DLW-Armstrong covering • Dunloplan covering • Gerflor covering • Tarkett-Sommer covering • Forbo covering • Freudenberg covering • Abet HPL covering

  15. Our panels are tested according to the following world-wide Standards • DIN EN (European and German Standard) • RAL GZ 941 (former German Standard) • MOB PSA (English Standard) • CISCA (American Standard) • ASTM 5116-97 (American Product Emission Test (System-Test)) • ISO 16000 (World Test – Product Emission Test (System-Test)) • Emission: Emission are volatile organic substances which are emitted from materials into the indoor environment. The emission behaviour of materials are determined in test chambers. Our tests will be carried out only by Testing Laboratories, which are accredited byUnited Kingdom Accreditation Service • BITS – Building Investigation and Testing Services Ltd., Redhill UK • CERAM Research Ltd., Stoke-on-Trent UK • Eurofins, Denmark (Emission Test) TEST REPORTS AVAILABLE !!

  16. Thank you very much for your attention

  17. Floor projects R e f e r e n c e s: • Aculeum, Frankfurt – 32.000 sqm • CEE, Brussels – 80.000 sqm • Tours Pleiad, Brussels – 65.000 sqm • Allianz, Munich – 25.000 sqm • Dresdner Bank, Frankfurt (1) – 43.000 sqm • Dresdner Bank, Frankfurt (2) – 27.000 sqm • Parque Empresarial, Madrid – 60.000 sqm • ZDF, German Television, Mainz – 30.000 sqm • BP, Melbourn, Australia – 30.000 sqm • Abanumy Centre, Saudi Arabia – 30.000 sqm • AMRO Banken, Netherlands – 50.000 sqm

  18. Floor projects R e f e r e n c e s: • Hewlett Packard, Germany – 32.000 sqm • Creditanstalt Vienna, Austria – 40.000 sqm • Bayrische Hypotheken Bank, Munich – 43.000 sqm • Bayrische Vereinsbank, Munich – 20.000 sqm • Westfälische Provinzialversicherung, Münster – 30.000 sqm • Banco Roberts, Argentina – 11.000 sqm • Reform Plaza, Polen – 32.000 sqm • Alcatel, Pakistan – 12.000 sqm • Banco Roberts, Argentina – 11.000 sqm • Shanghai Bell, China – 23.000 sqm • Central Ministeries, Singapore – 21.000 sqm • Sigma Tower Soul, Korea – 14.000 sqm • Deutsche Telekom, Germany – 85.000 sqm

  19. Floor projects R e f e r e n c e s: • Österreichische Post – 35.000 sqm • PTT Switzerland – 28.000 sqm • British Telecom – 25.000 sqm • Televerket, Norway – 25.000 sqm • Pakistan, Telekom – 18.000 sqm • Reichspost Sweden – 36.000 sqm • Rijkspost Netherlands – 34.000 sqm • Ihlas Finanzgruppe, Türkei – 32.000 sqm • Bank Ekinciler, Türkei – 13.000 sqm • GZB, Österreich – 26.000 sqm • Office building Lasallestraße, Austria – 12.000 sqm • Emirates Tower Dubai, U.A.E – 41.000 sqm

  20. Floor projects • Internet City, Dubai, U.A.E – 110.000 sqm • DIFC The Gate Building Dubai, U.A.E – 20.000 sqm • ETISALAT, Abu Dhabi, U.A. E – 2.000 sqm • Conference Palace Hotel, Abu Dhabi U.A.E – 5.000 sqm • Shangrila Hotel, Dubai U.A.E – 5.000 sqm • Belhasa Dubai Internet City U.A.E. – 1.100 sqm R e f e r e n c e s:

  21. Conclusion Your partner fordemanding fit out projects • over 45 years experience • integrated services: - Research & Development - design - manufacture - project management - installation • project-specific solutions • financial standing grade 146 grade 146 (excellent) • ISO 9001 certified - spaceframe systems - Floors - exhibition systems - Architectural Metal Work of

More Related