An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CRONOGRAMA VALORIZADO MENSUALIZADO PROYECTO: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE N°1 (SANTO TOMAS) DEL PP.JJ CHOCCO DE LA MARGEN DERECHA DEL DISTRITO DE SANTIAGO - PROVINCIA DE CUSCO - DEPARTAMENTO DE CUSCO"" ITEM DESCRIPCION UND. METRADO PRECIO S/. PARCIAL S/. MES-01 MES-02 MES-03 MES-05 MES-06 MES-07 MES-08 MES-09 MES-04 01 01.01 01.01.01 01.01.02 01.01.03 01.01.04 01.02 01.02.01 01.02.02 01.03 01.03.01 01.03.02 01.03.03 01.03.04 01.03.05 01.04 01.04.01 01.04.02 01.04.03 01.04.04 01.04.05 01.04.06 01.04.07 01.05 01.05.01 01.05.02 01.05.03 01.05.04 01.05.05 01.05.06 01.05.07 01.05.08 01.05.09 01.06 01.06.01 01.06.02 01.06.03 01.06.04 01.07 01.07.01 01.07.01.01 01.07.01.02 01.07.01.03 01.07.01.04 01.07.01.05 01.07.02 01.07.02.01 01.07.02.02 01.07.02.03 01.07.02.04 01.07.02.05 01.07.02.06 01.07.03 01.07.03.01 01.07.03.02 01.07.03.03 01.07.03.04 01.07.03.05 01.07.03.06 01.07.04 01.07.04.01 01.07.04.02 01.07.04.03 01.07.04.04 01.07.04.05 01.07.04.06 01.07.04.07 01.07.04.08 01.07.04.09 01.07.04.10 01.07.04.11 01.08 01.08.01 01.09 01.09.01 01.09.01.01 01.09.01.02 01.09.01.03 01.09.01.04 01.09.01.05 01.09.01.06 01.09.01.07 01.09.01.08 01.09.01.09 01.09.02 01.09.02.01 01.09.02.02 01.09.02.03 01.09.02.04 01.09.02.05 01.09.02.06 01.09.02.07 01.09.02.08 01.09.02.09 01.09.02.10 01.09.02.11 02 02.01 02.01.01 02.01.02 02.01.03 02.02 02.02.01 02.02.02 02.02.03 02.02.04 02.02.05 02.03 02.03.01 02.03.02 02.03.03 02.03.04 02.03.05 02.03.06 02.03.07 02.04 02.04.01 02.04.02 02.04.03 02.04.04 02.04.05 02.04.06 02.04.07 03 03.01 03.02 03.03 03.04 03.05 03.06 03.07 03.08 03.09 03.10 03.11 03.12 03.13 03.14 03.15 03.16 03.17 03.18 04 04.01 04.01.01 04.01.02 04.01.03 04.01.04 04.01.05 04.01.06 04.01.07 04.02 04.02.01 04.02.02 04.02.03 04.03 04.03.01 04.03.02 04.03.03 04.04 04.04.01 04.04.02 04.04.03 04.04.04 04.05 04.05.01 04.05.02 04.05.03 04.05.04 04.05.05 04.05.06 04.06 04.06.01 04.07 04.07.01 778,212.54 23,385.52 926.41 5,338.98 6,101.73 11,018.40 4,576.23 1,525.41 3,050.82 44,619.00 7,976.66 7,983.05 7,241.06 5,404.44 16,013.79 128,149.70 5,596.67 15,199.54 15,078.46 36,822.16 17,169.78 13,570.53 24,712.56 260,118.64 5,094.80 43,164.80 23,273.96 23,182.93 10,761.41 136,679.15 4,172.91 7,866.68 5,922.00 77,309.98 321.98 49,750.09 26,722.27 515.64 147,573.39 29,309.48 812.84 18,575.98 2,909.09 4,338.41 2,673.16 28,882.65 169.77 11,235.35 8,747.80 8,192.35 210.82 326.56 18,832.13 2,281.73 163.87 2,474.55 3,244.30 76.90 10,590.78 70,549.13 725.37 4,499.84 2,275.97 4,391.00 4,619.83 11,204.63 2,764.08 20,716.24 16,713.26 1,265.91 1,373.00 3,813.55 3,813.55 88,666.53 15,999.03 250.66 3,001.90 1,415.91 1,181.66 2,639.94 795.83 3,638.99 474.46 2,599.68 72,667.50 585.76 8,186.54 3,545.87 3,730.66 9,870.89 1,860.21 25,190.69 1,108.74 6,522.48 5,739.20 6,326.46 260,552.12 7,111.39 3,413.92 3,099.10 598.37 54,296.73 19,945.94 6,361.19 11,744.45 10,733.53 5,511.62 65,328.13 233.17 30,407.00 3,190.40 25,958.36 498.75 4,000.02 1,040.43 133,815.87 2,452.28 19,936.76 28,395.76 73,474.26 1,963.63 6,611.46 981.72 1,343,915.55 5,072.70 4,364.13 93,888.85 62,270.52 15,429.95 142,272.91 18,213.40 84,484.23 43,382.25 131,585.20 215,833.98 207,936.39 190,797.94 5,518.48 11,241.13 73,238.35 35,152.30 3,232.84 347,909.60 76,501.95 1,378.63 32,141.02 12,796.92 7,885.48 2,136.62 17,494.88 2,668.40 118,744.24 113,998.48 2,033.88 2,711.88 3,813.29 1,271.19 1,271.00 1,271.10 43,125.75 3,710.62 30,779.63 1,017.00 7,618.50 42,072.80 8,135.64 1,694.92 5,675.82 508.48 7,627.14 18,430.80 30,921.91 30,921.91 32,729.66 32,729.66 2,730,589.81 INFRAESTRUCTURA VIAL OBRAS PROVISIONALES und mes mes m 1.00 9.00 9.00 926.41 593.22 677.97 16.02 231.60 1,334.75 1,525.43 2,754.60 231.60 1,334.75 1,525.43 2,754.60 231.60 1,334.75 1,525.43 2,754.60 231.60 1,334.75 1,525.43 2,754.60 - - - - - - - - - - - - - - - - - - - - CARTEL DE IDENTIFICACION DE OBRA DE 3.60X2.40 M OFICINAS ALMACEN DE OBRA CERCO CON ARPILLERA 687.79 INSTALACIONES PROVISIONALES AGUA PARA CONSTRUCCION ENERGIA PROVISIONAL mes mes 9.00 9.00 169.49 338.98 169.49 338.98 169.49 338.98 169.49 338.98 169.49 338.98 169.49 338.98 169.49 338.98 169.49 338.98 169.49 338.98 169.49 338.98 OBRAS PRELIMINARES TRAZO, NIVELACION Y REPLANTEO PRELIMINAR MOVILIZACION Y DESMOVILIZACION DE EQUIPO m2 GLB m2 m2 mes 2,298.75 1.00 2,298.75 348.00 9.00 3.47 1,994.17 1,995.76 1,810.27 1,351.11 4,003.45 1,994.17 1,995.76 1,810.27 1,351.11 4,003.45 1,994.17 1,995.76 1,810.27 1,351.11 4,003.45 1,994.17 1,995.76 1,810.27 1,351.11 4,003.45 - - - - - - - - - - - - - - - - - - - - 7,983.05 3.15 15.53 1,779.31 LIMPIEZA DE TERRENO MANUAL ELIMINACION DE MALEZA Y ARBUSTOS DE FACIL EXTRACCION MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL MOVIMIENTO DE TIERRAS m2 m3 m3 m3 m2 m3 m3 1,998.81 902.05 254.36 567.63 1,998.81 305.23 1,082.46 2.80 16.85 59.28 64.87 8.59 44.46 22.83 - - - - - - - 1,399.17 3,799.89 3,769.62 9,205.54 4,292.45 3,392.63 6,178.14 1,399.17 3,799.89 3,769.62 9,205.54 4,292.45 3,392.63 6,178.14 1,399.17 3,799.89 3,769.62 9,205.54 4,292.45 3,392.63 6,178.14 1,399.17 3,799.89 3,769.62 9,205.54 4,292.45 3,392.63 6,178.14 - - - - - - - - - - - - - - - - - - - - - - - - - - - - TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO CORTE DE TERRENO CON MAQUINARIA CORTE MANUAL EN MATERIAL SUELTO RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO RIEGO, PERFILADO Y COMPACTADO EN ZONA DE CORTE ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=4 KM PAVIMENTO DE CONCRETO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO EXTENDIDO, RIEGO, BATIDO, PERFILADO Y COMPACTADO DE MATERIAL BASE m2 m2 m2 kg kg m3 m2 m m2 1,880.00 1,880.00 407.60 3,171.40 1,406.72 384.60 1,923.00 2,038.00 1,880.00 2.71 22.96 57.10 7.31 7.65 355.38 2.17 3.86 3.15 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,273.70 10,791.20 5,818.49 5,795.73 2,690.35 34,169.79 1,043.23 1,966.67 1,480.50 1,273.70 10,791.20 5,818.49 5,795.73 2,690.35 34,169.79 1,043.23 1,966.67 1,480.50 1,273.70 10,791.20 5,818.49 5,795.73 2,690.35 34,169.79 1,043.23 1,966.67 1,480.50 1,273.70 10,791.20 5,818.49 5,795.73 2,690.35 34,169.79 1,043.23 1,966.67 1,480.50 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO ACERO DE TEMPERATURA DE 1/4'' MALLA DE 30x30 cm JUNTAS DE CONTRACCION 5/8'' @0.30 L=0.40m CONCRETO PRE-MEZCLADO F'C=210 KG/CM2 CURADO DE CONCRETO JUNTAS ASFALTICAS LIMPIEZA DE TERRENO MANUAL SARDINELES m2 m2 m3 m2 118.81 871.28 65.35 237.62 2.71 57.10 408.91 2.17 - - - - - - - - - - - - - - - - 80.50 80.50 80.50 80.50 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO ENCOFRADO Y DESENCOFRADO DE SARDINLES CONCRETO f'c = 175 kg/cm2, EN SARDINELES CURADO DE CONCRETO 12,437.52 6,680.57 128.91 12,437.52 6,680.57 128.91 12,437.52 6,680.57 128.91 12,437.52 6,680.57 128.91 124,482.35 SISTEMA DE EVACUACION DE AGUAS PLUVIALES MOVIMIENTO DE TIERRAS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - m2 m3 m2 m3 m3 299.94 313.36 256.76 97.58 117.09 2.71 59.28 11.33 44.46 22.83 406.42 9,287.99 1,454.55 2,169.21 1,336.58 406.42 9,287.99 1,454.55 2,169.21 1,336.58 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO CORTE MANUAL EN MATERIAL SUELTO NIVELACION Y COMPACTADO DEL TERRENO ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=4 KM DISIPADORES m2 m2 m3 kg m2 m 5.41 31.38 82.25 426.93 6.86 1.78 3.86 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 84.89 84.89 - - - - - - EMPEDRADO CON PIEDRA DE 6" ENCOFRADO Y DESENCOFRADO DE DISIPADORES CONCRETO f'c = 210 kg/cm2, EN DISIPADORES ACERO DE REFUERZO f'y = 4200 Kg./cm2 136.60 20.49 1,194.22 118.44 84.60 5,617.68 4,373.90 4,096.18 105.41 163.28 5,617.68 4,373.90 4,096.18 105.41 163.28 CURADO DE CONCRETO JUNTAS ASFALTICAS SUMIDERO ENCOFRADO Y DESENCOFRADO EN SUMIDERO PERFILADO Y COMPACTADO PARA FONDO DE SUMIDERO m2 m2 m3 kg m2 m2 38.40 13.84 5.76 472.93 43.20 13.84 59.42 11.84 429.61 6.86 1.78 765.23 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,140.87 81.94 1,237.28 1,622.15 38.45 1,140.87 81.94 1,237.28 1,622.15 38.45 5,295.39 - - - - - CONCRETO f'c = 210 kg/cm2, EN SUMIDEROS ACERO DE REFUERZO f'y = 4200 Kg./cm2 CURADO DE CONCRETO SUMIDERO PREPARADO Y COLOCADOCON PLATINAS DE 2"X1/2" - 5,295.39 TUBERIAS TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO EXCAVACION MANUAL, TERRENO COMPACTO, P/ TUB. 200mm, a=0.60m, H=0.60m. m2 m m m m m3 m3 m m und m 259.06 223.65 113.12 431.76 431.76 284.96 62.17 286.73 145.03 1.00 431.76 2.80 20.12 20.12 10.17 10.70 39.32 44.46 72.25 115.24 1,265.91 3.18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 362.69 2,249.92 1,137.99 2,195.50 2,309.92 5,602.32 1,382.04 10,358.12 8,356.63 632.96 686.50 362.69 2,249.92 1,137.99 2,195.50 2,309.92 5,602.32 1,382.04 10,358.12 8,356.63 632.96 686.50 - - - - - - - - - - - EXCAVACION MANUAL, TERRENO COMPACTO, P/ TUB. 250mm, a=0.60m, H=0.60m. REFINE Y NIVELACION ZANJA T.N. P/TUB. 200 A 250 mm CAMA DE APOYO TN P/TUB Ø 200mm A Ø 250 mm RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION TUBERIA PVC DESAGUE SN-4 Ø 200mm.(8"), UF. TUBERIA PVC DESAGUE SN-4 Ø 250mm.(10"), UF. EMPALME A SUMIDERO EXISTENTE PRUEBA HIDRAULICA DE TUBERIA INSTALACIONES ELECTRICAS und 5.00 762.71 - - 3,813.55 - - REUBICACIÓN DE POSTES DE ENERGÍA ELECTRICA INSTALACIONES SANITARIAS REPOSICION DE TUBERIAS DE AGUA POTABLE TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO EXCAVACION MANUAL, TERRENO COMPACTO, P/ TUB. HASTA 90mm, a=0.60m, H=0.60m. m2 m m m m3 m3 m m und 89.52 149.20 149.20 149.20 67.14 17.90 149.20 149.20 12.00 2.80 20.12 9.49 7.92 39.32 44.46 24.39 3.18 216.64 - - - - - - - - - - - - - - - - - - - - - - - - - - - 83.55 83.55 83.55 - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,000.63 471.97 393.89 879.98 265.28 1,213.00 158.15 866.56 1,000.63 471.97 393.89 879.98 265.28 1,213.00 158.15 866.56 1,000.63 471.97 393.89 879.98 265.28 1,213.00 158.15 866.56 REFINE Y NIVELACION ZANJA P/TUB. 90mm CAMA DE APOYO TN P/TUB HASTA 90mm RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION TUBERIA PVC C-10 U.F. 2" PRUEBA HIDRAULICA DE TUBERIA CONEXIONES DOMICILIARIAS DE AGUA REPOSICION DE TUBERIAS DE DESAGUE m2 m m m m3 m3 m m und und und 209.20 348.66 348.66 348.66 251.04 41.84 348.66 348.66 36.00 8.00 6.00 2.80 23.48 10.17 10.70 39.32 44.46 72.25 3.18 181.18 717.40 1,054.41 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 195.25 2,728.85 1,181.96 1,243.55 3,290.30 620.07 8,396.90 369.58 2,174.16 1,913.07 2,108.82 195.25 2,728.85 1,181.96 1,243.55 3,290.30 620.07 8,396.90 369.58 2,174.16 1,913.07 2,108.82 195.25 2,728.85 1,181.96 1,243.55 3,290.30 620.07 8,396.90 369.58 2,174.16 1,913.07 2,108.82 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO EXCAVACION MANUAL, TERRENO COMPACTO, P/ TUB. Ø 8", a=0.60m, H=1.50m. REFINE Y NIVELACION ZANJA T.N. P/TUB. 200 A 250 mm CAMA DE APOYO TN P/TUB Ø 200mm A Ø 250 mm RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION TUBERIA PVC DESAGUE SN-4 Ø 200mm.(8"), UF. PRUEBA HIDRAULICA DE TUBERIA CONEXIONES DOMICILIARIAS DE DESAGUE ENCIMADO DE BUZONES BUZON DE CONCRETO ARMADO H=1.20-2.20M INFRAESTRUCTURA PEATONAL OBRAS PRELIMINARES TRAZO, NIVELACION Y REPLANTEO PRELIMINAR LIMPIEZA DE TERRENO MANUAL m2 m2 m2 983.84 983.84 38.53 3.47 3.15 15.53 - - - - - - - - - - - - 1,137.97 1,033.03 199.46 1,137.97 1,033.03 199.46 1,137.97 1,033.03 199.46 - - - - - - ELIMINACION DE MALEZA Y ARBUSTOS DE FACIL EXTRACCION MOVIMIENTO DE TIERRAS m3 m3 m2 m3 m3 336.47 161.78 1,036.58 241.42 241.42 59.28 39.32 11.33 44.46 22.83 - - - - - - - - - - - - - - - - - - - - - - - - - 6,648.65 2,120.40 3,914.82 3,577.84 1,837.21 6,648.65 2,120.40 3,914.82 3,577.84 1,837.21 6,648.65 2,120.40 3,914.82 3,577.84 1,837.21 - - - - - CORTE MANUAL EN MATERIAL SUELTO RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO NIVELACION Y COMPACTADO DEL TERRENO ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=4 KM ESCALINATAS m2 m2 m2 m3 m2 m m2 86.04 369.69 101.67 63.94 229.84 244.50 61.13 2.71 82.25 31.38 405.98 2.17 16.36 17.02 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 77.72 77.72 77.72 - - - - - - - TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO ENCOFRADO Y DESENCOFRADO EN ESCALINATA 10,135.67 1,063.47 8,652.79 166.25 1,333.34 346.81 10,135.67 1,063.47 8,652.79 166.25 1,333.34 346.81 10,135.67 1,063.47 8,652.79 166.25 1,333.34 346.81 EMPEDRADO CON PIEDRA DE 6" CONCRETO f'c = 175 kg/cm2, EN ESCALINATA CURADO DE CONCRETO BRUÑAS EN ESCALINATAS PINTURA PARA ESCALINATAS VEREDAS m2 m2 m2 m3 m2 m m 904.90 361.96 904.90 180.98 904.90 606.00 303.00 2.71 55.08 31.38 405.98 2.17 10.91 3.24 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 817.43 6,645.59 9,465.25 24,491.42 654.54 2,203.82 327.24 817.43 6,645.59 9,465.25 24,491.42 654.54 2,203.82 327.24 817.43 6,645.59 9,465.25 24,491.42 654.54 2,203.82 327.24 - - - - - - - TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO ENCOFRADO Y DESENCOFRADO DE VEREDAS EMPEDRADO CON PIEDRA DE 6" CONCRETO f'c = 175 kg/cm2, EN VEREDAS CURADO DE CONCRETO BRUÑAS EN VEREDAS JUNTAS ASFALTICAS, E=1", H=1", ASF:AGR 1:4 MUROS DE CONTENCION LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 m2 m3 m3 m3 m3 m2 m3 m3 kg m2 m3 m3 m m m m2 m2 1,610.38 1,610.38 1,583.82 3,695.58 392.42 1,624.12 1,610.38 1,900.23 1,900.23 19,042.72 3,986.59 585.11 698.74 268.67 466.05 642.78 1,719.78 1,816.20 3.15 2.71 59.28 16.85 39.32 87.60 11.31 44.46 22.83 6.91 54.14 355.38 273.06 20.54 24.12 113.94 20.44 1.78 845.45 727.36 15,648.14 10,378.42 2,571.66 23,712.15 3,035.57 14,080.71 7,230.38 21,930.87 35,972.33 34,656.07 31,799.66 919.75 1,873.52 12,206.39 5,858.72 538.81 845.45 727.36 15,648.14 10,378.42 2,571.66 23,712.15 3,035.57 14,080.71 7,230.38 21,930.87 35,972.33 34,656.07 31,799.66 919.75 1,873.52 12,206.39 5,858.72 538.81 845.45 727.36 15,648.14 10,378.42 2,571.66 23,712.15 3,035.57 14,080.71 7,230.38 21,930.87 35,972.33 34,656.07 31,799.66 919.75 1,873.52 12,206.39 5,858.72 538.81 845.45 727.36 15,648.14 10,378.42 2,571.66 23,712.15 3,035.57 14,080.71 7,230.38 21,930.87 35,972.33 34,656.07 31,799.66 919.75 1,873.52 12,206.39 5,858.72 538.81 845.45 727.36 15,648.14 10,378.42 2,571.66 23,712.15 3,035.57 14,080.71 7,230.38 21,930.87 35,972.33 34,656.07 31,799.66 919.75 1,873.52 12,206.39 5,858.72 538.81 845.45 727.36 15,648.14 10,378.42 2,571.66 23,712.15 3,035.57 14,080.71 7,230.38 21,930.87 35,972.33 34,656.07 31,799.66 919.75 1,873.52 12,206.39 5,858.72 538.81 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - CORTE MANUAL EN MATERIAL SUELTO CORTE DE TERRENO CON MAQUINARIA RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO NIVELACION Y COMPACTADO DEL TERRENO ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=4 KM ACERO FY = 4200 Kg/cm2 GRADO 60 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS CONCRETO PRE-MEZCLADO F'C=210 KG/CM2 CONCRETO f'c = 175 kg/cm2 + 60% P.G. JUNTA EN MURO CON TECKNOPOR e=1" DRENAJE TRANSVERSAL EN MUROS DRENAJE LONGITUDINAL EN MUROS GEOTEXTIL CURADO DE CONCRETO TRABAJOS COMPLEMENTARIOS AREAS VERDES m2 m3 m3 m3 m2 m2 und 508.72 542.19 287.83 345.40 508.72 508.72 56.00 2.71 59.28 44.46 22.83 4.20 34.39 47.65 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 689.32 16,070.51 6,398.46 3,942.74 1,068.31 8,747.44 1,334.20 689.32 16,070.51 6,398.46 3,942.74 1,068.31 8,747.44 1,334.20 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO CORTE MANUAL EN MATERIAL SUELTO ACARREO MATERIAL EXCEDENTE PARA SU ELIMININACION ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=4 KM NIVELACION Y COMPACTADO DEL TERRENO COLOCACION DE BLOQUES DE PASTO COLOCACION DE PLANTONES EQUIPAMIENTO URBANO - - - - - - m und und 696.94 4.00 4.00 163.57 508.47 677.97 113,998.48 2,033.88 2,711.88 BARANDA DE FIERRO GALVANIZADO BANCA DE CONCRETO CON ASIENTO DE MADERA BASURERO METALICO PRUEBAS DE CONTROL DE CALIDAD DISEÑO DE MEZCLAS PRUEBAS DE RESISTENCIA DEL CONCRETO PRUEBA DE DENSIDAD DE CAMPO MITIGACION DE IMPACTO AMBIENTAL - - - - und PRU und 3.00 50.00 30.00 423.73 25.42 42.37 1,271.19 158.88 158.89 158.88 158.89 158.88 158.89 158.88 158.89 158.88 158.89 158.88 158.89 158.88 158.89 158.88 158.89 m2 m3 und m2 3,198.81 1,348.21 12.00 450.00 1.16 22.83 84.75 16.93 - - - - - - - - - - - - - - 3,710.62 10,259.88 113.00 7,618.50 LIMPIEZA FINAL DE OBRA ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=4 KM MANEJO DE RESIDUOS SOLIDOS DURANTE LA CONSTRUCCION REACONDICIONAMIENTO DE AREA OCUPADA SEGURIDAD Y SALUD EN OBRA 10,259.88 113.00 10,259.88 113.00 113.00 113.00 113.00 113.00 113.00 113.00 und GLB GLB GLB mes GLB 12.00 1.00 1.00 1.00 9.00 1.00 677.97 1,694.92 5,675.82 508.48 847.46 18,430.80 8,135.64 1,694.92 5,675.82 508.48 7,627.14 18,430.80 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - EQUIPAMIENTO DE PROTECCION COLECTIVA ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD SEÑALIZACION TEMPORAL DE SEGURIDAD RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS (BOTIQUIN DE EMERGENCIA) CAPACITACION EN SEGURIDAD Y SALUD EN OBRA EQUIPO DE PROTECCION INDIVIDUAL PLAN DE VIGILANCIA Y PREVENCION DEL COVID PLAN DE VIGILANCIA Y PREVENCION DEL COVID GLB 1.00 30,921.91 3,435.77 3,435.77 3,435.77 3,435.77 3,435.77 3,435.77 3,435.77 3,435.77 3,435.77 PLAN DE MONITOREO ARQUEOLÓGICO GLB 1.00 32,729.66 TOTAL 3,636.63 292,342.67 3,636.63 281,036.11 3,636.63 284,849.66 3,636.63 310,591.62 3,636.63 380,318.11 3,636.63 432,760.93 3,636.63 257,970.67 3,636.63 299,146.57 3,636.63 191,573.47 PLAN DE MONITOREO ARQUEOLOGICO 10.71% 10.29% 10.43% 11.37% 13.93% 15.85% 9.45% 10.96% 7.02% AVANCE MENSUAL 10.71% 21.00% 31.43% 42.80% 56.73% 72.58% 82.03% 92.98% 100.00% AVANCE ACUMULADO

More Related