1 / 11

Session structure Why do we need an improvement/upgrade plan? Overview Actions Challenges Outputs

Module 5 Improvement/upgrade plan. Session structure Why do we need an improvement/upgrade plan? Overview Actions Challenges Outputs Exercises. Module 5 Improvement/upgrade plan. Why do we need an improvement/upgrade plan? Prioritize action for each uncontrolled or ineffectively

Download Presentation

Session structure Why do we need an improvement/upgrade plan? Overview Actions Challenges Outputs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Module 5Improvement/upgrade plan • Session structure • Why do we need an improvement/upgrade plan? • Overview • Actions • Challenges • Outputs • Exercises

  2. Module 5Improvement/upgrade plan • Why do we need an improvement/upgrade plan? • Prioritize action for each uncontrolled or ineffectively • controlled risk • Implement short-, medium- and long-term activities • Maximize effectiveness of resources ? Do you know what to do?

  3. Module 5Improvement/upgrade plan • Overview • Improvement/upgrade plan involves • Development • Implementation • Maintenance • Monitoring and review of upgrades • Required due to absent or ineffective control measures • Should explicitly state who is responsible

  4. Module 5Improvement/upgrade plan Introduction of new controls could introduce new risks

  5. Module 5The plan(iterative process) • New risks? • Uncontrolled risks? • Short • Medium • Long term • Recalculate the risks • Update the WSP

  6. Module 5Improvement/upgrade plan • Example plan • Review example plan in workbook • Invent a new “action” • Complete rest of table: • Arising from • Improvement plan • Accountabilities • Due • Status • What other factors need to be considered when developing • an upgrade plan (see Appendix G)?E.g. Is there a need for research and development?

  7. Module 5Improvement/upgrade plan • Challenges • Ensuring WSP is up to date • Securing finances • Lack of resources • Ensuring new risks are not introduced or are mitigated

  8. Module 5Improvement/upgrade plan • Outputs • A prioritized improvement/upgrade plan for addressing each uncontrolled risk • Implementation of short-, medium- and long-term activities for upgrade • A process for monitoring the plan

  9. Module 5Improvement/upgrade plan • Exercise • In small groups • Develop a suitable “health awareness campaign” for your water supply area (10 minutes) • Identify key factors that need consideration for financial investment of a system upgrade activity to be realized – outline a draft proposal (20 minutes)

  10. Module 5Improvement/upgrade plan Summary of WSP stage 2 – system assessment Describe the water supply system (Module 2) Identify the hazardous events/hazards & assess the risks (Module 3) Determine & validate control measures, reassess & prioritize risks (Module 4) Develop, implement & maintain an improvement/ upgrade plan (Module 5) Catchment Treatment Distribution User Any agent or event that can cause harm. Likelihood and consequence of occurrence What is preventing hazardous events/hazards from occurring? How can you be sure these controls are suitable? A plan is needed if existing controls are ineffective or absent

More Related