Maynard Jackson High School 801 Glenwood Avenue Project Overview

Maynard Jackson High School 801 Glenwood Avenue Project Overview. October 20, 2011. March 25, 2010. Facilities Services Department. Project Location. Project Description. Grades: 9 – 12 Site Size: +/- 25.0 acres Number of Students: +/- 1,200 (divided into 3 small learning communities)

Download Presentation

Maynard Jackson High School 801 Glenwood Avenue Project Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Maynard Jackson High School801 Glenwood AvenueProject Overview October 20, 2011 March 25, 2010 Facilities Services Department

  2. Project Location

  3. Project Description • Grades: 9 – 12 • Site Size: +/- 25.0 acres • Number of Students: +/- 1,200 (divided into 3 small learning communities) • Core Classrooms: +/- 65 approximate • Total Classrooms: +/- 85 approximate • Approximate Size: +/- 314,251 sf • Project Schedule: Proposed to relocated Jun 1, 2012 - reopen Aug 5, 2013 • Renovation of existing building, classrooms and support spaces • Renovation of Cafeteria and Kitchen • Renovation of Theater • Renovation of Competition and Practice Gymnasium • New Turf Football field (can also be used for soccer, lacrosse, etc.) • 400 meter track • Baseball Field • New Softball Field • Tennis courts (3) • Reconfigured parking, drop-off and bus cueing areas

  4. Conceptual Site Plan

  5. Conceptual Floor Plans Proposed Plan at Main Floor

  6. Conceptual Floor Plans Proposed Plan at Upper Floor

  7. Conceptual Floor Plans Proposed Plan at Lower Floor

  8. Project Timeline • Select Architect June 1, 2011 • Design Kick-Off Meeting w/ school August 22, 2011 • Draft Design Narrative September 30, 2011 • Convene Project Committee No. 1 October 21, 2011 • Schematic Design November 16, 2011 • Select Construction Manager November 18, 2011 • Preliminary Submittal to GDOE November 15, 2011 • Preliminary Submittal to UDC November 30, 2011 • Preliminary submittal to COA December 1, 2011 • Design Review No. 1 December 1, 2011 • Project Committee Meeting No. 2 December 6, 2011 • Design Development January 30, 2012 • 50 % Construction Documents April 1, 2012 • Project Committee Meeting No. 3 April 30, 2012 • 95 % Construction Documents May 1, 2012 • Design Review No. 2 May 22, 2012 • “Check Set” submittal to GDOE May 1, 2012 • “Final” submittal to GDOE May 15, 2012 • 2011 – 2012 School Ends May 22, 2012 • Relocate School June 1, 2012 • Project Committee Meeting No. 4 June 25, 2012 • Start Construction July 1, 2012 • Substantial Completion July 1, 2013 • School Opening August 5, 2013

  9. Questions & Answers March 25, 2010