1 / 6

CSQE Practice Test Exam Dumps 2020

Study units and arrangement materials gave by us to CSQE test are approved by the experts and industry specialists. You can without much of a stretch breeze through your accreditation test with our cerebrum dumps and PDF test questions. Please use 20off2019 as discount voucher to avail 20% discount for more information please visit here: https://www.CertsChief.com/exam/CSQE/

Download Presentation

CSQE Practice Test Exam Dumps 2020

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CertsChief Guaranteed Success with Accurate & Updated Questions. ASQ CSQE ASQ Certified Software Quality Engineer Questions & Answers PDF For More Information - Visit: https://www.certschief.com/ ProductFull Version Features:  90 Days Free Updates  30 Days Money Back Guarantee  Instant Download Once Purchased  24/7 Online Chat Support Visit us athttps://www.certschief.com/exam/csqe/

  2. Latest Version: 6.0 Question: 1 Which of the following is intended to result in the creation of program components that are inherently reusable? Response: A.Object-oriented programming B.Structured analysis C.Structured programming D.Prototyping Answer: A Question: 2 The following code segment contains a potential “divide by 0” error. J=50 K=1 while (N>=10) and (N<=10) loop M [K] = J/N K = K + 1 N = N 1 end loop Which of the following is the most effective way of detecting this error? Response: A.Boundary testing B.Condition testing C.Compilation of the source code D.Source code inspection Answer: D Question: 3 Which of the following techniques is used in identifying underlying problems? Response: A.Cause and effect analysis B.Force field analysis C.Prioritization matrix D.Pareto analysis Answer: A Visit us athttps://www.certschief.com/exam/csqe/

  3. Question: 4 Which of the following would be the most useful criterion to use when determining which subcontractor to select for a project? Response: A.The subcontractor’s process capability maturity level B.The prime contractor’s process capability maturity level C.The prime contractor’s costs for evaluating and managing the subcontractor D.The subcontractor’s prior experience with similar applications Answer: D Question: 5 Which of the following is the principle reason for developing a prototype? Response: A.It may solve a problem that is not included in the requirements. B.It can be used as an early production tool. C.It reduces the schedule for development through alpha testing. D.It allows the customer to provide feedback about requirements. Answer: D Question: 6 Which of the following is a method for calculating a quality cost factor due to an external failure? Response: A.Measuring the customer’s system downtime over a one-year period B.Totaling the penalty fees that must be paid to the customer due to late delivery of a software product C.Measuring the amount of time spent fixing defects found during system testing D.Measuring the amount of effort spent performing code reviews Answer: A Question: 7 Records of the results of inspections should include which of the following? Visit us athttps://www.certschief.com/exam/csqe/

  4. Response: A.Identification of inspectors, list of defects, and date performed B.Date performed, management approval, and resources used C.Identification of inspectors, their qualifications, and their training records D.Work product, list of defects, and configuration status Answer: A Question: 8 Which of the following is the most important feature of an audit report? Response: A.It includes responses to all checklist questions. B.It is verifiable C.It is based on the lead auditor’s recommendations. D.It follows ISO 19011. Answer: B Question: 9 A customer satisfaction survey used the following rating scale: 1 = very satisfied 2 = satisfied 3 = neutral 4 = dissatisfied 5 = very dissatisfied This is an example of which of the following measurement scales? Response: A.Interval B.Nominal C.Ordinal D.Ratio Answer: C Question: 10 Which of the following types of libraries is used for managing baselines? Visit us athttps://www.certschief.com/exam/csqe/

  5. Response: A.Controlled B.Public C.Static D.Dynamic Answer: A Visit us athttps://www.certschief.com/exam/csqe/