An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHARUSAT CLOUD PROJECT

  2. Phases Hardware Commissioning Implementing Cluster Implementing VMware Migration of campus servers to cloud…..

  3. HP C7000 Blade Centre housing 7 Blades & each Blade comprising : • 2 No of Xeon Hexacore (2.66 Ghz) CPU • 48 GB ECC RAM • 300 GB Internal Harddisk • ……. All these linked with HP SAN Box(Storage • Area Network) with the capacity 20 TB • Also ……. • Six redundant power supply • Redundant backbone fiber controller card • Redundant IO controller • LTO-5 Auto loader for the Data backup • 10 KVA Online UPS with 5 hours of Battery backup 1- Hardware Commissioning

  4. 2- Implementation of Cluster Concept .. For best utilization of these state-of-the-art Hardware facility, at WINCell, we have implemented Cluster of 7 Blades. Here we are merging the highest level power of each Blade into one central unit (Cluster) which has now the central power of 14 Processors (221 Ghz) and 335 GB RAM Other Salient Features :High Availability Highest RedundancyDynamic Resource Scheduling (DRS)

  5. 3-Implementation of VMware Concept With major concerns of Global-warming and Echo friendly environment VMware is designed to provide multiple Server Applications on a single physical Blade server. This will help save : Electricity Cooling Facilities (AC) Battery Backup (UPS) Physical space Man power Management constraints. Hardware Cost, etc.. VMware implies the resources virtualization

  6. Implementation VMware Commissioning … With available 7 Blades, we have already created 38 Virtual Servers of different Institutes and departments through VMware. Considering future requirements such 30 to 40 more virtual servers can be configured with current setup.

  7. 4-Migration of campus servers tocloud….. At campus we have implemented both Private and PublicReady cloud : Process… All Institutes and departmental level server applications and campus e-governance facilities are being migrated to central cloud ready environment at WINCell through Private cloud Cloud means …. To utilize others IT resources and infrastructure for your IT requirements. Other Moti27 organizations like Matrusanstha located at Piplag, KelavaniMandal located at Anand and Hostel located at Vidhyanagar are centrally connected through Public cloud and hence their server level applications and other IT requirements are facilitated centrally. All these IT setup is managed through VCenterapplication at WINCell.