1 / 16

Welcome to Cse490ra - Tablet PC Independent Study Course

Explore elevator systems, commissioning, maintenance activities, and a tool demo for diagnostics. Learn about Schindler Elevator Corp. and the project goals.

droose
Download Presentation

Welcome to Cse490ra - Tablet PC Independent Study Course

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to Cse490ra - Tablet PC Independent Study Course

  2. Cse490ra - Tablet PC Independent Study Course • Introduction • Elevators:- on the way up • Schindler what? • Who am I? • Today’s Elevator : A Subsystem Overview • Commissioning & Maintenance Activities • Tool Demo • Project Goals

  3. Cse490ra - Elevators:- on the way up In the beginning ...

  4. Cse490ra - Elevators:- on the way up And then ...

  5. Cse490ra - Elevators:- on the way up Now ...

  6. Cse490ra - Elevators:- on the way up And someday soon ...

  7. Cse490ra - Schindler what? • Schindler Elevator Corp. • Swiss based, family owned company • #1 in escalators, #2 overall • 43,000 Employees worldwide • 150+ Countries • 15,000 Elevators sold per year • Maintenance Portfolio > 250,000 units • Turnover $6 billion per year

  8. Cse490ra - Who am I ? • Name: Chris Mason • Degree: MS Computer Science - Major in AI and Diagnostic Applications • Occupation: Chief Architect SW Devt for Schindler R&D • Office: 15413 NE 95th St., Redmond, WA Tel: 1 206 291 3011 • Email: chris_mason@us.schindler.com

  9. Service Handler Group Control Group Control COM I/F COM I/F PB-Driver Serial I/O IO-Handler Lift Control Travel Control Periphery Manager Door Control LMS Brake Buttons, Switches, Lamps Buttons, Switches, Lamps Safety I/Os Local Door Controller Door Motor Load Sensor Cse490ra - Today’s Elevator: A Subsystem Overview Group Bus Group Peripheral Bus CADI CAR 1 SMLCD Motor Control CAR 2 Motor Lift Peripheral Bus Cabin Prints Speed Sensor Position Sensor

  10. Cse490ra - Commissioning & Maintenance Activities • Commissioning • Parameter adjustment prior to testing and final inspection. • Access to inspection specific commands and modes of operation. • Preventative • Today mostly restricted to mechanical servicing of components including lubrication, adjustment, inspection and replacement. • Restorative • Error detection & display • Problem analysis • Error elimination

  11. Cse490ra - Tool Demo: Group Overview

  12. Cse490ra - Tool Demo: Error Log

  13. Cse490ra - Tool Demo: Call Simulation and telegram trace

  14. Cse490ra - Tool Demo: IO-Display and telegram generator

  15. Cse490ra - Tool Demo : Parameter Adjustment

  16. Cse490ra - Project Goals • Research information on the subject of diagnostics • Gather a basic set of User Reqts through interaction with field personnel. • Analyze existing Diagnostic Tool I/F in light of these requirements and current technologies available. • Propose new Diagnostic Tool I/F using current technologies and GUI paradigms. • Execute two design and implementation cycles with a prototype Diagnostic Tool I/F as end result. • Have fun and gain practical experience with the project process, elevators, diagnostics and the Tablet PC.

More Related