An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PS/SPS Days Roberto Losito/Oliver Aberle13th January 2004 How to get reliable PSB sieve and PS&SPS dumps for 2006?

  2. Overview • Internal dumps • Sieve • Beam stoppers • TIDVG • Summary PS/SPS days

  3. PS internal dumps • Installed dump 47 operational (control unit problems) • Dump 48 mechanically ok • Spare in radioactive storage, control problem? • Transportation problem solved, lifting device will be tested these days • Working space (bunker, INB) found by R. Brown, ready within 3 weeks PS/SPS days

  4. PS internal dumps • Dump 48 mechanically updated • Water bellows to be changed • Water and electrical connectors to replace • Cabling to be replaced • Power supply to be changed • Check capturing magnet • Test intensively • Standardise control units • Reference dump PS/SPS days

  5. PS internal dumps • Installed dump 47 stays • Installation of dump 48 • Upgrading of spare dump • Depending on schedule start up with dump 47 or replacement of dump 47 by spare dump • Upgrading of dump 47 • New supports to simplify the alignment procedure PS/SPS days

  6. PS Sieve • Working since 1977 • Originally designed for 1 mio. cycles, which has been reached in 1981 • Material Graphite • Movement with air pistons • Water cooled • Not working reliably • No spare parts! PS/SPS days

  7. PS Sieve • Short term (2005): • Demount sieve from the machine • Maintenance on mechanical parts(Piston, water and air connections, bearings) • Adjust air and waterpressure after lab tests • Reinstall sieve PS/SPS days

  8. PS Sieve • Long term (2006/2007): • Prepare two additional units with small design changes • Re-use vacuum tank or build new modified vacuum tanks? • Replace Graphite with CFC • Replace sieve actually installed • Prepare one complete spare unit PS/SPS days

  9. PS beam stoppers • 33 stopper in the PS complex • Different types • Stoppers in good general condition • Take stock of spare components • Annual maintenance of installed stoppers PS/SPS days

  10. SPS TIDVG • Internal beam dump • Length 4.5m • C / Cu / Al / W core • 22 tons cast iron shielding • water cooled • vacuum temp. measurement • vertical deflection PS/SPS days

  11. SPS TIDVG • Ti foils to prevent from C particle contamination • Ti foil stretched over dump core materials • 5 foils with overlap, not closed • Each foil end is lifted PS/SPS days

  12. SPS TIDVG • Damaged Ti foil • Length of damage:30 mm • Height of foil displacement:10 mm • Position: End of first foil/ circulating beam PS/SPS days

  13. SPS TIDVG • Proposed modification: • Tests on graphite blocks covered by Ti foil (10-15mm from the edge). If successful • remove all Ti foils by cutting with special tool on spare TIDVG. • Same intervention on spare core • Modify the spare cast ion body of the TED to get a full spare TIDVG • Store the damaged TIDVG as back up • Installation of modified dump in April 2005 PS/SPS days

  14. Summary • PS Dumps: Two upgraded dumps ready for startup 2006, spare in stand by. • PS sieve: 3 month to maintain the existing sieve, construction of a spare on the same design principle (in 2006). • PS beam stoppers: Inventory and annual maintenance, spare stoppers for 2006/07. • TIDVG: “Light” solution for time, manpower and budget reasons. Reinstallation within 3 months. Preparation of spare 2007. PS/SPS days