1 / 13

Printers Parkway and Parkside Drive Roundabout

Printers Parkway and Parkside Drive Roundabout. PUBLIC OPEN HOUSE CONSTRUCTION: SUMMER 2019 KEVIN DIEKELMAN, CITY ENGINEERING. City of Colorado Springs, Public Works Department JACOBS Engineering Group H ayward , LLC. Property Owner Resident Work Commute. Project Overview.

elsiec
Download Presentation

Printers Parkway and Parkside Drive Roundabout

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Printers Parkway and Parkside Drive Roundabout PUBLIC OPEN HOUSE CONSTRUCTION: SUMMER 2019 KEVIN DIEKELMAN, CITY ENGINEERING

  2. City of Colorado Springs,Public Works Department • JACOBS Engineering Group • Hayward, LLC

  3. Property Owner • Resident • Work • Commute

  4. Project Overview • Reconfigure intersection with a Roundabout • Storm drain network • Pedestrian Improvements • Restripe Approaches • Realign & upgrade water mains

  5. Project Need: Safety!

  6. Project Need: Safety! • High Accident Rating • Federal Safety Grant • Reduce conflict points

  7. Project Need: Safety! • High Accident Rating

  8. Project Need: Safety! • Federal Safety Grant • Using the 2010 data point, the City applied for and was awarded federal dollars from the Hazard Elimination Safety Program (HES). • $624,000 • Additional dollars from the City, Springs Utilities, and RTA will complete the Project.

  9. Project Need: Safety! • Reduce conflict points 32 Total Conflict Points 42 Total Conflict Points

  10. 42 Total Conflict Points 52 Total Conflict Points

  11. Project Need: Safety! • Reduce conflict points 8 Total Conflict Points

  12. Schedule • Public Outreach • Bid/select construction contractor Summer 2019 • 6-month schedule anticipated

  13. Project Information https://coloradosprings.gov/printerspkwyimprovements