An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategic Asset Management at The University of Western Australia A presentation to the University Managers’ Group – August 2009 Facilities Management

  2. Strategic Asset Management Plan (UniverCity) • Provide a long term, high level, flexible land use and transport strategy for all the University’s landholdings. From Crawley to Shenton Park. • Provide guidance for the University’s acquisition and development plans over the next 50 years. • Provide a tool for high level discussions with Government e.g. Local Government Boundaries. UniverCity - Arc of Knowledge

  3. Strategic Asset Management Framework

  4. Campus Plan 2010 • Ensure there is sufficient land and buildings to accommodate University’s growth (i.e. enrolment of 25,000 students by 2020). • Place the University to the best advantage to meet external, often unforeseeable situations. • Planning for the expansion of the campus in a westerly direction to Broadway. • Operating from Campus Plan 2000. • VC’s Steering Committee to commence in September 2009 to guide development of the Campus Plan. • Estimated completion: April 2010.

  5. AK Reserve/ UWA Sports Park Master Plan and CSIRO • Create a sporting precinct of regional, national and international significance. • Development at the precinct is progressing with a new Athletics Stadium completed in July 2009 and a Basketball Stadium to be completed in November 2009. • Increasing Research presence of UWA at CSIRO and at Sports Park.

  6. QEII/ Fiona Stanley Hospital sites • The University is a key partner in the funding of major research facilities at these metropolitan hospital campuses, including: • A projected $100m facility at QEII; and • A projected $70m facility at Fiona Stanley Hospital.

  7. Sustainability UWA Transport Plan • Address transport issues at the University in the context of: • limited car-parking supply - cap with State Planning: 4250 parking bays. • Requirements for significant increases in provision of non-automobile transport modes (buses, bikes, walking, scooters etc.) - Campus Loop Bus Service. • Draft Transport Plan which has been revised in 2009 in the context of the Campus Plan 2010.

  8. Sustainability UWA Landscape Master Plan 2007-2011 • Conserve, enhance and renew landscapes to ensure a consistent quality across all University sites. • Master Plan was completed in 2006 and is still current. • Revised in 2009 in the context of the Campus Plan 2010. • Including accommodating the Conservation Plan.

  9. Gathering Administration February Academic needs Compliance Facility Renewal Research Partners Requested Project List Compiling University Strategic Plan & Operational Priorities Plan Assessing Campus Plan University Funding Gifts Accommodation Plan August FDC Approval APPROVED CAPITAL PLAN Capital Planning Process at UWA (TYCEP) Definition A comprehensive overview of facilities needs for the University in the context of statutory, campus & academic planning, funding, facility renewal and compliance parameters. • • Scope • Covers a 10-year span in two • 5-year tranches. • Updated annually. • Can be amended mid-year if • circumstances change. • 14 Faculties/Areas in 6 months. • New construction, minor and • major refurbishment, moves, • FF&E. • Goals • An annual process • Begins early in the academic year. • Iterative and communicative. • Share related information along the way. • Balance immediate and long-term accommodation needs. • Year-round process

  10. Capital Developments and Accommodation Planning • Business School • Facility was occupied by staff in February 2009. • Formal opening was held on 3 May 2009. • Sciences Library • Draw together many of the University’s library resources and services. • Create major focal point for student learning and world class scientific research. • Practical Completion of Stage 1 achieved in June 2009 and of Stage 2 expected in November 2009. • Student Housing • Currie Hall • Caporn and Everett Streets • One Stop Shop/Business School Space backfill • QEII/ Fiona Stanley Hospital Research Facilities • Albany New Sciences Building

  11. Campus and Accommodation Planning • The University recognises the likely significant growth in student numbers, research activities and support staff over the next decade (e.g. enrolment target of 25,000 students by 2020. • The UWA Capital Works Program to accommodate planned growth (2007-2017) prepared by the Office of Finance and Resources anticipated a major expenditure in the order of $500million. The current growth and the size of the capital works program justified the investigation of opportunities for associated savings. • A UWA Accommodation Efficiency Audit was proposed in response to the growth and a final draft is under review with the view to discuss with key University stakeholders the implementation of the audits recommendations. • Some planned outcomes of the Audit were – • to identify opportunities to locate some growth within existing UWA campus sites, rather than expanding to additional land and/or buildings therefore reducing the University’s operational costs and contributing to a more sustainable campus management • to review current building use to enhance space utilisation • to examine the provision of shaping spaces for innovation, creating a variety of learning settings, both individual and collaborative, formal and informal.

  12. Future Presentations by Facilities Management for 2010 • FM Services Review – Our new Structure • Strategic Asset Planning • Campus and Accommodation Planning • UWA Capital Plan • Sustainability Questions