1 / 4

ETM 607 – Simulation Software and Arena Modeling

ETM 607 – Simulation Software and Arena Modeling. Review simulation software. http://www.lionhrtpub.com/orms/surveys/Simulation/Simulation1main.html “Hands-on” experience with a discrete-event simulation software package, Arena. simple single server queue input, model logic, outputs

Download Presentation

ETM 607 – Simulation Software and Arena Modeling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ETM 607 – Simulation Software and Arena Modeling • Review simulation software. • http://www.lionhrtpub.com/orms/surveys/Simulation/Simulation1main.html • “Hands-on” experience with a discrete-event simulation software package, Arena. • simple single server queue • input, model logic, outputs • additional logic features • In-class exercise, model and analyze complex process

  2. ETM 607 – In-Class Exercise Camshaft Machining Line Process Flow Grind “Main Bearings” Grind Lobes Polish Lobes

  3. ETM 607 – In-Class Exercise Camshaft Machining Line – Process Details OperationNameCycle TimeDowntimeDress 10 Main Grinder ~Unif(5.6,6.0) ~Exp(540) 100 cycles Rep. ~Norm(15,5) ~Unif(10,11) 20 Lobe Grinder ~Tria(12.1,12.5,15.0) ~Exp(360) 50 cycles Rep. ~Norm(25,5) ~Unif(8,9) 30 Polisher ~Unif(3.2,3.4) 350 cycle ~Norm(12,2) 20 10 20 30 : : 10 20

  4. ETM 607 – In-Class Exercise • Camshaft Machining Line – Process Details • Develop an Arena Model of the Camshaft Machining Line • Include unplanned downtime • Include dress cycles • Determine the minimum number of machines for each operation to support a production rate of 250 camshafts per shift • Assume a shift is 450 minutes • Output Analysis • Report queue sizes, machine utilization, machine downtime for various “number of machine” combinations. • Provide a recommendation for the number of machines for each operation. • Email group results to schultz_sr@mercer.edu

More Related