An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. David ChildersMarch 27, 2008Final Slides for:Center of MassStructures Costs AAE 450 Spring 2008

  2. Center of Mass • Preliminary Design • Center of Mass over time • 1 size fits all-No size difference for each payload • Scaled down Vanguard • Linearly related to Tsohas Rocket for burn rates and masses • Reference point bottom of Vehicle • Final Design • Center of Mass for full and empty stages • Reference point top of vehicle • Both • Point Mass System • Axisymmetric • Masses located on body axis AAE 450 Spring 2008 1 Structures

  3. Structure Cost Process • Include Material, Rolling, Rivets, Welding • Manufacturing • Rolling for just 3 hrs/sheet-No major difference between materials • Material costs for non-space grade Aluminum • Results in Cost in low $100,000’s • Tanks added • Original price of Al: $2.30/kg, New price: $13.23/kg • Tanks alone priced at several $100,000’s if not millions for large volumes • Manufacturing moved to include non-tank components • Results jumped into millions AAE 450 Spring 2008 2 Structures

  4. Center of Mass Assumptions • Cm of third stage moves down when empty • Result of Engine Mass: • Mengine > Mpayload • Point Mass System • Symmetric about body axis • All masses are centered • Top of vehicle is reference • Stage Numbered bottom to top AAE 450 Spring 2008 Structures

  5. Cost Breakdown • Manufacturing cont. • Other • $70/hr for 5 hrs/sheet • Ti 5.5 times longer than Al or Steel • Performed for: • Nose cone, Skirts, Skin between tanks, etc. • Material • Rate: • Al=$13.23/kg (Space grade) • Stl=$0.23/kg • Ti=$88.91/kg • Manufacturing • Welding • $150/hr • Times: • Al=0.6m/hr • Stl=0.65m/hr • Ti=0.325m/hr • Rivets • 1 rivet/6in (1r/0.152m) • $0.73/rivet • 0.049 hr/rivet • $52/hr AAE 450 Spring 2008 Structures

  6. Tanks Cost Cost Breakdown • ATK Values • Best fit line from Excel using values acquired from ATK • y = 157169Ln(x) + 714253, • where x=volume • 10% Discount for multiple tanks • Alternate Approach • Spincraft Values • Labor=$150/hr • Al &Stl: 26 wks (40hrs/wk) • Ti: 52 wks • Not used because of fixed rates • Same price no matter size of tank Figure by David Childers AAE 450 Spring 2008 Structures

  7. Structure Cost Breakdown Manufacturing Other Manufacturing includes non-tank components, rolling, drilling, forming, etc. AAE 450 Spring 2008 6 Structures

  8. References • Paul Morissette, Gilchrist Metal Fabrication • Walter Tam of ATK Space Systems, Inc. (PSI Operations), http://www.psi-pci.com/. • Mike Murphy, Spincrafthttp://www.spincraft.net/aerospace.htm. • Mark Sutton, G.E. • Cost Considerations in using Titanium, Green, E. A., Coulon, J. F. Lockheed-California Company, Burbank, California v AlAA Paper. • http://www.metalprices.com/ • TitaniumJoe.com • Youngstown Tool & Die Co. • RobotMarketplace.com • Tsohas, J., “AAE 450 Spacecraft Design Spring 2008: Guest Lecture Space Launch Vehicle Design”, 2008 AAE 450 Spring 2008 Structures