1 / 8

Time Meeting: Agenda

Time Meeting: Agenda. Safety Schedule: Past, Present and Future RHIC and Experiments Reports Machine and Systems Reports AOB. Safety. Take 5 for Safety………….. Ed Lessard. Schedule: Past. Last night’s stores…. ZDCs. DCCT. Schedule: Past. Access last Wednesday 20 Nov 2007

helen
Download Presentation

Time Meeting: Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time Meeting: Agenda • Safety • Schedule: Past, Present and Future • RHIC and Experiments Reports • Machine and Systems Reports • AOB

  2. Safety • Take 5 for Safety…………..Ed Lessard

  3. Schedule: Past Last night’s stores… ZDCs DCCT

  4. Schedule: Past • Access last Wednesday 20 Nov 2007 • Fix a broken IPM • Swapping a power supply card at yi10-tq4. • Attempt (failed) to fix current transformer in TtB • Current too high in Q89. New ramp developed to avoid overheating. • Rebucketing problems led to “dancing” beams on the ramps. Turning on Landau cavities helped. • Yellow and Blue Collimators got final adjustment • Vernier scans completed for both STAR and PHENIX • Smoke/Fire Alarms

  5. Schedule: Future • Maintenance day tomorrow 28 Nov 2007 • Replace the AGS vacuum chamber at L05. • Replace breaker at Bldg 929 and 1004B. • Water tower work at 929. • Continued work on the TtB current transformer. • Install Iris scanner at 4 OClock • Next maintenance day set for 5 Dec 2007, immediately preceded by the first APEX shift. • Continue to push to improve delivered beam • Bunch intensity, Number of bunches • Fill reliability • Background • Scrubbing

  6. RHIC and Experiments Reports • RHIC………………………….…….Kip Gardner • STAR......................................Bill Christie • PHENIX.................................Mike Leitch • Polarimeter…………………….Haixin Huang • MonoPole….............Vasily Dzhordzhadze • BLIP…………………….…..Leonard Mausner • Operations…………………………Fulvia Pilat

  7. Machine Reports • Operations………….…...Peter Ingrassia • Sources...............................Jim Alessi • Booster and AGS...............Leif Ahrens • Maintenance………….…Paul Sampson • Beam Lines…………………..Al Pendzick • Instrumentation……...……..Tom Russo

  8. Systems Reports • Vacuum..........................Mike Mapes • Cryogenics…………..Andy Warkentien • Power………………………Jon Sandberg • RF................................Alex Zaltsman • Controls...........................John Morris • Access Controls……….Jonathan Reich • RCF………………………....Michael Ernst