An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Importance of longer-term perspective in Romanian Wind Energy Market ČEZ 7th September 2012 Filip Strohwasser– Long-term Originator

  2. AGENDA PART I Introduction of CEZ Group PART II Importance of longer-term perspective in Romanian Wind Energy Market PART I+II CEZ Group and its potential on longer-term Romanian Wind Energy Market

  3. CEZ GROUP IS AN INTERNATIONAL UTILITY WITH A STRONG POSITION IN CEE Energy Assets Active subsidiary Trading Activities Source: CEZ, national statistics, data for 2011, CZK/EUR 24.59 2

  4. PL CZ SK HU RO BG Fantanele Cogealac Resita CEZ GROUP IN ROMANIA MAINLY FOCUSES RENEWABLES FOLLOWED BY DISTRIBUTION AND ELECTRICITY SUPPLY • Romania • Fantanele & Cogealac (600 MW) • Largest wind farm project in Europe • 300 MW in operation at the end of 2011, additional 300 MW by end of 2012 • Total investment is estimated at € 1.1 bn • Support through green certificates (GC) – price range set by law at € 27-55 per certificate, 2 GCs are received for each MWh since November 2011 until 2017, 1GC per MWh afterwards • Hydro power plants in Resita • TMK Hydroenergy Power S.R.L. acquired in 2011 • 4 small hydro plants with total capacity of 18 MW

  5. AGENDA PART I Introduction of CEZ Group PART II Importance of longer-term perspective in Romanian Wind Energy Market PART I+II CEZ Group and its potential on longer-term Romanian Wind Energy Market

  6. HIGHLIGHTS • Romanian wind energy market is growing only in terms of capacity due to several projects, but there are not many new important entities operating wind farms • Romanian wind energy market needs to develop its longer-term market • Investors willingness of low risk/low profit scheme; convenient legislative environment and sufficient number of credible counterparties will bring desired longer-term perspective to the market

  7. ROMANIA WIND MARKET SEEMS TO BE ATTRACTIVE HOWEVER JUST FEW NEWCOMERS ENTERED WITHIN LAST YEAR • Pipeline in Romania counts over 8 GW (234 projects) of wind projects • Capacity of 3-3,5 GW to be sustainable from grid perspective • Majority of the projects promises interesting ROIC(if properly financed) Wind dispatchable capacity installed (MW) Number of entities • 1/6/2011 • 1/1/2012 • 1/6/2012 As 234 projects on pipeline, where are the others? Source: Transelectrica SA - http://www.transelectrica.ro/

  8. PROJECTS AND THEIR INVESTORS ARE STRUGGLING WITH PROJECT FINANCING AND PPA • Struggling Investor in Romanian Wind Farm • has all the permissions for further development and construction • is unsuccessfully looking for Project financing and a PPA buyer Details “…not a lot/none buyers available” • Potential PPA Buyers will be available, when • Investors share project value to get significant market risk mitigation • Legislation will officially allow PPAs (mainly power issue), … • Bank needs to see credible counterparty „Market risk of green certificates/scheme support is huge” Note.: 1) PPA – production purchase agreement (offtake agreement on power and green certificates)

  9. REQUIRED PPA STRUCTURE SHOULD BE SUFFICIENTLY LONG, WITH RELIABLE COUNTERPARTY AND COVER MARKET RISKS Duration& off-taker: • 5-15 years • Credible counterparty Risks to be mitigated: • Green certificate market risk • Power market risk • Balancing market risk • Structure: • PWR market reference + floor / fixed price • GC market reference + floor / fixed price • Balancing fixed balancing / pass through • Currency RON/EUR

  10. CONCLUSION • Once part of Struggling Strategic Investors in Romanian Wind Farm • Investors share project value to get significant market risk mitigation • Legislation will officially allow PPAs • Available credible counterparty then ramp up in terms of operating wind farms entities will come Wind dispatchable capacity installed (MW) Number of entities • 1/6/2012

  11. AGENDA PART I Introduction of CEZ Group PART II Importance of longer-term perspective in Romanian Wind Energy Market PART I+II CEZ Group and its potential on longer-term Romanian Wind Energy Market

  12. CURRENT CEZ GROUP POSITION IN ROMANIA CREATES MANY OPPORTUNITIES WITHIN WIND MARKET AND SUCH SITUATION MAY CONTRIBUTE TO DESIRABLE DEVELOPMENT CEZ GROUP – credible counterparty Sell Production Purchase Agreements Wind Farm Fantanele&Cogealac + others 1 Buy Production Purchase Agreements 2 Supplier/distribution CEZ Vanzere/CEZ Distributie Short/long term Power and GC supply 3 Weather forecast Tomis Team SRL Production Forecast / Balancing 4 Trading entity CEZ TRADE Romania Market gate / brokerage 5 Hydro Resita Buy/sell flexibility/ power plant tolling 6

  13. Thank you for your attention Filip Strohwasser Origination CEZ a.s. Duhova 1/1444 140 53 Prague 4 Czech Republic Phone: +420 211042766 Mobile: +420  725628297 E-mail: filip.strohwasser@cez.cz 