Wind Turbine Project

Wind Turbine Project. Jared Freyer , Fahad Ahmad, Anthony Christie, Yuanhua Cheng. Project History. Created by Purdue BGI Club Developed to create a wind turbine feasibility study. Community Need . Promote the sustainability and need for wind power in Indiana

ketan
Download Presentation

Wind Turbine Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind Turbine Project Jared Freyer, Fahad Ahmad, Anthony Christie, Yuanhua Cheng

  2. Project History • Created by Purdue BGI Club • Developed to create a wind turbine feasibility study

  3. Community Need • Promote the sustainability and need for wind power in Indiana • Using the wind turbine as a living laboratory • Provide power to the intramural field lights and feed power back into the Purdue power grid

  4. Site of Interest • Planned installation near the intramural fields • Site is close to the northwest substation • In close proximity to Purdue power lines • Higher elevation than surrounding area • Highly visible to Purdue students • Proximity to campus would allow for easier educational access

  5. Turbine Site Grid Interconnect

  6. Turbine Features • Power output • 20 kW rated power output @ 25 mph • 240 V /60 hz / 1 Phase • Features • Self-erecting • Electric Yaw Controller • Dynamic Brake System • Price and Emissions offset • $108,128 initial price • $5,234/year annual maintenance • 37 year complete payback • 52.5 tons/year CO2 offset (DOE/EPA)

  7. Turbine Dimensions • Height • 79 ft (24 m) tall tower • 20 ft (6 m) blade radius • 99 ft (30 m) tall total height • Base at approximately 650 ft above sea level • Noise • 61.7 dB at distance of 25 ft (7.6 m) • Virtually soundless (20 dB) at distance of 275 ft (84 m)

  8. Turbine Height Comparison Turbine: 99 ft (30 m) tall 650 ft (198 m) above sea level Bell Tower: 160 ft (49 m) tall 620 ft (189 m) above sea level

  9. Turbine Video Sample • http://www.youtube.com/watch?v=ehjhofMVoN0&feature=player_embedded