1 / 4

STEP 1 Develop/update RCM Program Plan

STEP 2 New Equipment Design Recommended. STEP 2B. STEP 3. Complete End Item & Level 1 Breakdown. SSWG. System Safety input to Severity Classification of failure modes. Select Severity Class for the failure mode. STEP 10. STEP 4. Complete Level 2 Breakdown.

Download Presentation

STEP 1 Develop/update RCM Program Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STEP 2 New Equipment Design Recommended STEP 2B STEP 3 Complete End Item & Level 1 Breakdown SSWG System Safety input to Severity Classification of failure modes Select Severity Class for the failure mode STEP 10 STEP 4 Complete Level 2 Breakdown Calculate or estimate failure distribution curve STEP 13 STEP 2 Current Equipment Design STEP 2A STEP 11 Complete FMECA. Complete Levels 3 and 4 Breakdowns STEP 5 Calculate or estimate time to first failure STEP 14 STEP 8 Identify all functional failures and Compensating Provisions STEP 12 Collect failure and test data Identify all functions STEP 6 STEP 9 Identify all failure modes and their failure effects (Local, Next Higher & End Effects) FULL RCM PROGRAM TASK SEQUENCE FLOWCHART STEP 1 Develop/update RCM Program Plan STEP 7 Perform Functional Significance Determination for each function FUNCTIONAL SIGNIFICANCE DETERMINATION LOGIC Does the loss of function have an adverse effect on safety or environment? Yes No Does the loss of function have an adverse effect on operations? Yes No Does the loss of function have an adverse effect on economic? Yes No Is this function protected by an existing PM task? Yes No NON-SIGNIFICANT FUNCTION SIGNIFICANT FUNCTION Select a failure mode for RCM Analysis and perform STEPS 11 thru 23 Steps 8 and up steps are not to be performed for this function. Perform STEP 7 for next function. RELIABILITY ANALYSIS RCM ANALYSIS TASKS REDESIGN / CIP TASKS IMPLEMENTATION TASKS A OTHER EVENTS OPERATIONS FEEDBACK TASKS FMECA TASKS 2 - 7 2 – 8 (Blank)

  2. STEPS 18 Answer failure consequences questions. (MODULE 10) Is the functional failure or effect of the failure mode, on its own, evident to the operator while performing normal duties? Develop Other Action STEP 18E Develop Other Action Develop Failure Finding PM task STEP 18F STEP 18E YES NO EVIDENTDoes the failure mode cause a function loss or secondary damage that could have an adverse effect on operating safety or lead to serious environmental violation? HIDDEN Does the occurrence of the hidden failure mode in combination with a second failure / event cause a function loss or secondary damage that could have an adverse effect on operating or lead to serious environmental violation safety? NO NO YES YES Evident Safety / Environment Evident Economic / Operational Hidden Economic / Operational Hidden Safety / Environment STEPS 18A THRU 18F REQUIRED INFORMATION (as applicable, not all data required for all FM’s) Description for each task Determine Number of OC or PHM tasks required during PF interval to meet Pacc Determine PM intervals for all tasks Determine Single task total man-hours and cost STEP 18B Develop Servicing / Lubrication PM task STEP 18A Develop PHM task STEP 18A Develop Servicing / Lubrication PM task STEP 18B Develop PHM task Will this failure mode happen within the service life of the equipment? STEP 15 Develop On-Condition PM task STEP 18C Develop On-Condition PM task STEP 18C Determine whether failure has PF, wear out, or random type failure characteristics STEP 16 STEP 17 Determine or estimate PF condition, PF-FF interval or wear out/life limit age Develop Hard Time PM task STEP 18D Develop Hard Time PM task STEP 18D FULL RCM PROGRAM TASK SEQUENCE FLOWCHART A NO YES Steps 16 and up steps are not to be performed for this failure mode. GO TO STEP 23 B C D E 2 - 7 2 – 8 (Blank)

  3. Repeat STEPS 11 thru 23 until all FM(s) have been analyzed STEP 23 STEP 19 Determine costs associated with each STEP 18A thru 18F item + No action taken costs Determine costs associated with each STEP 18A thru 18E item STEP 19 STEP 19 Determine costs associated with each STEP 18A thru 18F item Determine costs associated with each STEP 18A thru 18E item + No action taken costs STEP 19 Review RCM results with SSWG, FST, maintainers and operators for inputs. (MODULE 14) STEP 24 Analysis/ Select which option or combination of options is best at meeting RCM metrics STEP 20 STEP 20 Analysis/ Select which option or combination of options is best at meeting RCM metrics STEP 20 Analysis / Select which option or combination of options is best at meeting RCM metrics STEP 25 Perform Packaging Process Review RCM results with designers and potential operators/maintainers for inputs STEP 24 Perform LORA and update maintenance plan STEP 26 Provide usage prediction data (STEP 13) to logistics to ensure adequate replacement parts are available STEP 21 Go to STEP 2B Develop Age Exploration task STEP 22 Direct PM task to be implemented regardless of RCM results PMA / APML FULL RCM PROGRAM TASK SEQUENCE FLOWCHART B C C D E Is hardware in-service or undergoing design testing? Analysis/ Select which option or combination of options is best at meeting RCM metrics STEP 20 Design Testing In-service * * * PM Task/s required Redesigned required Redesigned required No action required PM Task/s required PM Task/s required Redesigned required Recommended PM acceptable? YES NO NO GO TO STEP 2B GO TO STEP 2B No additional analysis is required. GO TO STEP 23 Was engineering judgment / estimated values used during any part of the RCM analysis? * - YES NO F

  4. Collect test and in-service data STEP 28 Does new data support current FMECA and RCM entries? STEP 29 Go to STEP 6 Go to STEP 28 Implement PM tasks STEP 27 FULL RCM PROGRAM TASK SEQUENCE FLOWCHART F YES NO NO

More Related