1 / 2

Traffic Management

Traffic Management. Latex –Percent Above Initial Minimum Retroreflectivity. Epoxy –Percent Above Initial Minimum Retroreflectivity. Statewide Striping and Spending. Total Striping Miles and Cost per Foot. Striping. CY2003. Measure: Initial Minimum Retroreflectivity - Minimum Targets:

lidia
Download Presentation

Traffic Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Traffic Management Latex –Percent Above Initial Minimum Retroreflectivity Epoxy –Percent Above Initial Minimum Retroreflectivity Statewide Striping and Spending Total Striping Miles and Cost per Foot Striping CY2003 Measure: Initial Minimum Retroreflectivity - Minimum Targets: Latex Epoxy White 275 MCD White 300MCD Yellow 180 MCD Yellow 200 MCD Striping Line Miles LatexEpoxy 2002 15,030 2,182 2003 14,878 2,812 • Initial Striping Retroreflectivity Performance Observations (February 20, 2004 District Operations Presentation) • Measures changed from 2002 to 2003. The measures for 2002 were for % of latex and epoxy completed. The measures for 2003 were: 1) Initial Minimum Retroreflectivity, and 2) Maintenance Indicators – the percent of miles above performance values used to schedule maintenance or replacement (see next page). • Central Striping Business • To achieve mandated cost reduction: 1) The line thickness of epoxy and latex paint was reduced from 15 to 12 mils. ; and 2) The amount of glass beads in epoxy was reduced from 30 lbs/gal to 15 lbs/gal. • The 2003 Savings was: 1) Latex - $249,927; and 2) Epoxy - $504,131 for a total savings of $754,058. • Pavement Marking Performance Assumptions (Spring 2003) • 1. All current pavement marking materials on all highways meet the policy for material selection. • 2. Latex paint must be renewed annually to meet the 365 day performance goal. In reality, it may not last a year on Metro freeways. Epoxy has a statewide average life of 5 years.

  2. Traffic Management Percent Above Maintenance Indicators Striping CY2003 Performance values used to schedule maintenance or replacement: 80 MCD for Yellow 100 MCD for White Target: Maintenance Indicators = 100% • Maintenance Indicators Performance Observations • (February 20, 2004 District Operations Presentation by Office of Traffic, Security and Operations) • Maintenance Indicators should be at 100% • Initial performance of liquid markings is low. • Strategic Plan for Pavement Markings • 1. All District Plans are being reviewed • Gaps in the data are being identified • Statewide inventory and performance data base • Resources needed to meet goals will be identified. • 2004 Work Plan • Construction reports • New products • Complete strategic plan • Preventive maintenance task force. • Assistance Needed • Complete strategic plans • Collect data • Two laserlux vans • Six handheld units in districts • Work on issues and solutions with construction • Continue Preventive Maintenance Task Force. • Resources Needed • Approximately $5 million deficit to meet 2007 material goal. • Proposal to accelerate compliance with the tech memo.

More Related