1 / 16

DeHiGate (CELTIC No: CP02-008) WP1 Status

Pekka Parviainen TKK – Helsinki University of Technology Finland pekka.parviainen@lut.fi. DeHiGate (CELTIC No: CP02-008) WP1 Status. Agenda: 01 WP1 Overview 02 WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…. Agenda: 01 WP1 Overview 02 WP1 Status

lori
Download Presentation

DeHiGate (CELTIC No: CP02-008) WP1 Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pekka Parviainen TKK – Helsinki University of Technology Finland pekka.parviainen@lut.fi DeHiGate (CELTIC No: CP02-008)WP1 Status

  2. Agenda: 01WP1 Overview 02WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05Other…

  3. Agenda: 01WP1 Overview 02 WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

  4. WP1 Overview 1 WP1 Goals • Define the lead applications and their operational scenarios • High-speed data applications • Demanding requirements for user interfaces • Gateway requirements and wide area networking • Reliability, security and service quality are key attributes • Create real added value to the public safety field operations • Used for the development of requirements in WP2 and system architectures

  5. WP1 Overview 2 WP1 Sub packages • T1.1 Interaction with user community and user studies • Contribute to network features and operational scenarios • Contribute with contacts with user communities • User requirements studies: reference scenarios studies, applications, deployment strategy, and feasibility with emergency protocols • Initial review and assessment of key applications • Report on the viability of the key applications and further guidance • Use case description of the selected key applications in practical field operations • Studies on functional applications to make Gateway use easier for Emergency services users

  6. Expert Discussion Workshop Date:10th of November 2005 Location: City of Helsinki Rescue Department All key users in public safety communications (meeting minutes) • Helsinki Rescue Department • Finnish Naval Military • Poliisiosasto / Police of Helsinki • Helsingin ja Uudenmaan sairaanhoitopiiri (HUS) • Finnish Red Cross • Suomen Erillisverkot Oy

  7. Demands of Different organisations • For small and large scale scenarions • IR camera for smoke diving • data connections to hospitals • connect the mobile command center to fixed IT servers • how to have reserved capacity available • online geographic images for field units • air to ground video • remote surveillance of patrolling police officers vital functions

  8. WP1 Overview 3 WP1 Sub packages • T1.1 Interaction with user community and user studies • Description and a work-plan of trial/simulation set-up and required technologies for the use cases • Description on the result of the trial/simulation, plan for the improved/modified trial • Assessment and evaluation of the results of the simulations and trials • Studies on current technological Platforms of Emergency services • Users Interfaces Requirements

  9. WP1 Overview 4 WP1 Deliverables: • D1.1 Initial assessment of key applications, user studies report. Scenarios, operational requirements, and applications • D1.2 Report on the viability of the key applications and user guidance

  10. WP1 Overview 5 WP1 Leader • EADS Finland WP1 Partners • TKK • UNIK • Telefonica I+D

  11. Agenda: 01 WP1 Overview 02WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

  12. WP1 Status WP1 Status • Deliverables have been produced in time • User workshop was organized in 2005 with Finnish participants from different public safety fields • Assessment document for Kuopio Field Trial written • Technical document with minor user assessments • Concentration on multicast video

  13. Agenda: 01 WP1 Overview 02WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

  14. WP1 Deliverables this term WP1 Deliverables: • D1.1 Initial assessment of key applications, user studies report. Scenarios, operational requirements, and applications

  15. Agenda: 01 WP1 Overview 02WP1 Status 03 WP1 Deliverables this term 04WP1 Deliverables next term 05 Other…

  16. WP1 Deliverables next term WP1 Deliverables: • D1.2 Report on the viability of the key applications and user guidance • T0 + 30

More Related