An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. World Class Manufacturing / Multi National Operations-Business Units World Class Manufacturing / Multi National Operations-Business Units Lean Manufacturing Small Diamondcutblades www.m-tpartners.com.br

  2. Objetivos • Reduzir fluxo de materiais em 60% • Ganho em áreas livres em 40% • Reduzir Lead Time em 70% • Diminuir estoque em processo para zero

  3. Lay-out anterior Grandes Espaços livres

  4. ...para aumentar o valor agregado. Terceirização Pintura dos disco 110 Realização : Comitê Lay-out & Célula de Manufatura

  5. Terceirizaçãodapintura Depois Antes Pintura a Base de Solvente Pintura Eletrostática a Pó

  6. 5 Disco 110 s Atividade antecedente a mudança Realização : Comitê Housekeeping / 5S /MPT

  7. Atividades do 5s

  8. Atividades do 5s

  9. Após programa 5s Área do disco 110 Vista depois da atividade de 5S Material de descarte

  10. Atividades mudança do lay-out Cabine de pintura Desmontagem e transferência da Cabine de pintura para área do respatilhamento

  11. Atividades mudança do lay-out

  12. Atividades mudança do lay-out

  13. Atividades mudança do lay-out Área do disco 110

  14. Resultado 1ª Vista da área Antes 5s Depois 5S

  15. Resultado 2ª Vista da área Antes Depois Fev. Mudança Lay-out- Julho

  16. Resultado Lay-out / Fluxo anterior Pintura Pintura banheiro PH 005 PH 004 Et VN 001 Numerar Calibrar furo secagem Logotipo PP 001 Lixadeira FB 008 PE 001 Embalagem Fianl RT 12 Expedição RT 14 RT 15 VN 002 Forno PH 20 VN 003

  17. corredor Pintura Prateleira Prato lixadeira Entr. disco TR12 banheiro TR14. pp teste TR15. BC res fb Área livre 107 m2 Painel Emb pe Pr BC BC Forno Bancada BC resf resf Resultado Lay-out / Fluxo Atual Entrada do material Kamban Saída do material Pintura externa Expedição

  18. Distância Percorrrida (Passos) Redução 79% Área (m2) Redução 36,6% Resultado

  19. Pesa diamente Separa Faz Peso T.Ciclo=1,33min/pç Nº Oper.= 8 Nº Turma= 1 T.Setup=1min L.Pr..=2500pç/d Veloc.=0,16min/pç T.Ciclo= 40min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 1,10min L.Pr..= 8pç/ciclo Veloc.=0,16 min/pç (1,33 min/8pç) T.Ciclo= 70min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 0 L.Pr..= 8 pç/ciclo Veloc. 0,23 min T.Ciclo= 0,25min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 5 mni/pç L.Pr..= T.Ciclo= 1,33min/20pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 5 mni/pç L.Pr..= 20 pç/ciclo Veloc. 0,07 min T.Ciclo= 1min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 10 mni/pç L.Pr..= T.Ciclo= 0,3min/pç Nº Oper.= 3 Nº Turma= 1 T.Setup= 10 mni/pç L.Pr..= veloc.0,10 min/pç T.Ciclo= 4,85min/50pç Nº Oper.=2 Nº Turma= 1 T.Setup= 2 min/Tc.tinta 20 min/Pr.tinta L.Pr..= Veloc. 0,05 min T.Ciclo= 20min/50pç Nº Oper.=2 Nº Turma= 1 T.Setup= 10 mni/pç L.Pr..= Veloc.0,4min/pç T.Ciclo= 10min/50pç Nº Oper.=1 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= Veloc. 0,20 min T.Ciclo= 0,16min/pç Nº Oper.=1 Nº Turma= 1 T.Setup=20 mni/pç L.Pr..= T.Ciclo= 1,23min/20pç Nº Oper.=1 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= Veloc. 0,06 min T.Ciclo= 0,25min/pç Nº Oper.=2 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= Veloc. 0,125 min T.Ciclo= 0,25min/pç Nº Oper.=1 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= T.Ciclo= 0,25min/pç Nº Oper.=1 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= T.Ciclo= 0,66min/pç Nº Oper.=2 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= veloc.0,33min/pç Resfr. Emb.. PANO Resfr. Esto Forno Grav. Furo. Sec.Est.. Ret.L. Resfr. lixa Pintura Seg.. Pr. Frio Gr.Tela. Ret.D.. Labor. Pesa diamante Mistura liga + DTE Pesa Liga + DTE T.Ciclo=8 min Nº Oper.= 1 Nº Turma= 1 T.Setup=0 L.Pr..=2500pç/d Veloc.=0,003min/pç T.Ciclo=50 min Nº Oper.= 1 Nº Turma= 1 T.Setup=0 L.Pr..=2500pç/d Veloc.=0,02min/pç T.Ciclo=420 min Nº Oper.= 2 Nº Turma= 1 T.Setup=0 L.Pr..=2500pç/d Veloc.=0,168min/pç Tempo de valor não agregado = 158 Horas Tempos de valor agregado =2,5 Horas Tak Time = 0,195 min Takt Time = tempo Disponível x (%) Efeciência Demanda Takt Time = 528(min/d) x 20 (d/m) x 085 = 0,195 min/pç 46.000 (pç/m) Resultado VSM – Resumo Situação Anterior Mapeamento do Fluxo de Valor do Disco 110 Siscorpp- sugere Gestão de Demanda Programa de 5 Semanas Entraga Semanal Demanda realimenta Novas Necessidades Semanal PCP Analisa:Altera , valida. Cancela Base: Demanda média dos ultimos 3,6,12 e estoque Cliente Fornecedor E 7 dias 3.696min E 10 dias 5.280min Laboratório Valor agregado = 2,5h / Disco

  20. Pesa diamente Separa Faz Peso T.Ciclo=1,33min/pç Nº Oper.= 8 Nº Turma= 1 T.Setup=1min L.Pr..=2500pç/d Veloc.=0,16min/pç T.Ciclo= 40min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 1,10min L.Pr..= 8pç/ciclo Veloc.=0,16 min/pç (1,33 min/8pç) T.Ciclo= 70min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 0 L.Pr..= 8 pç/ciclo Veloc. 0,23 min T.Ciclo= 0,25min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 5 mni/pç L.Pr..= T.Ciclo= 1,33min/20pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 5 mni/pç L.Pr..= 20 pç/ciclo Veloc. 0,07 min T.Ciclo= 1min/pç Nº Oper.= 1 Nº Turma= 1 T.Setup= 10 mni/pç L.Pr..= T.Ciclo= 1,23min/20pç Nº Oper.=1 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= Veloc. 0,06 min T.Ciclo= 0,25min/pç Nº Oper.=2 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= Veloc. 0,125 min T.Ciclo= 0,25min/pç Nº Oper.=1 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= T.Ciclo= 0,25min/pç Nº Oper.=1 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= T.Ciclo= 0,66min/pç Nº Oper.=2 Nº Turma= 1 T.Setup= 0 mni/pç L.Pr..= veloc.0,33min/pç Grav. Furo. PANO Resfr. Resfr. Esto Pr. Frio Seg.. Ret.D.. Ret.L. Emb.. Forno Labor. Pesa diamante Mistura liga + DTE Pesa Liga + DTE T.Ciclo=8 min Nº Oper.= 1 Nº Turma= 1 T.Setup=0 L.Pr..=2500pç/d Veloc.=0,003min/pç T.Ciclo=50 min Nº Oper.= 1 Nº Turma= 1 T.Setup=0 L.Pr..=2500pç/d Veloc.=0,02min/pç T.Ciclo=420 min Nº Oper.= 2 Nº Turma= 1 T.Setup=0 L.Pr..=2500pç/d Veloc.=0,168min/pç Tempo de valor não agregado = 157,8Horas Tempos de valor agregado =1,6 Horas Tak Time = 0,195 min Takt Time = tempo Disponível x (%) Efeciência Demanda Takt Time = 528(min/d) x 20 (d/m) x 085 = 0,195 min/pç 46.000 (pç/m) Resultado VSM – Resumo SituaçãoAtual Mapeamento do Fluxo de Valor do Disco 110 Siscorpp- sugere Gestão de Demanda Programa de 5 Semanas Entraga Semanal Demanda realimenta Novas Necessidades Semanal PCP Analisa:Altera , valida. Cancela Base: Demanda média dos ultimos 3,6,12 e estoque Cliente Fornecedor E Pintura 7 dias 3.696min E 10 dias 5.280min Laboratório Valor agregado = 1,6h / Disco

  21. Resultado Plano Real Resumo final 60% 79% Reduzir fluxo de materiais 40% 36,6% Ganho em áreas livres 70% 36% Reduzir lead time MSV 0% 30% Diminuir estoque em processo para zero

  22. Obrigado Marlus Fida +5511 9676 9712 marlus.fida@m-tpartners.com