CTF3 BEAM DYNAMICS ISSUES R. Corsini

Beam dynamics meeting. CTF3 BEAM DYNAMICS ISSUES R. Corsini. CTF3 - Transverse beam dynamics issues. Transfer Line To CR (TL1). CTF3 Layout. Delay Loop. Drive Beam Accelerator. Stretcher. Combiner Ring. CLEX. locations relevant effects issues/studies codes (presently used)

neal
Download Presentation

CTF3 BEAM DYNAMICS ISSUES R. Corsini

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam dynamics meeting CTF3 BEAM DYNAMICS ISSUES R. Corsini

  2. CTF3 - Transverse beam dynamics issues Transfer Line To CR (TL1) CTF3 Layout Delay Loop Drive Beam Accelerator Stretcher Combiner Ring CLEX locations relevant effects issues/studies codes (presently used) Injector/1st chicane space charge, CSR ? matching, oscillations, coupling ? PARMELA-MATHCAD models Linac transverse wake-fields linear optics,steering,(in)stability MAD (with acceleration) Stretcher/TL1 CSR linear optics,dispersion, emittance growth ? ? DL & Combiner Ring Deflector wake-fields linear optics,transverse stability PLACET, INFN code (D. Alesini)

  3. Quad scans (II) Quad scans (I) • Quad scans (I) in girder 7 • Quad scans (II) in end-of-linac screen Measurement (II) Reconstructed with MAD from (I) Fit (II) CTF3 - linac modeling chicane linac • Beam transport 100% (3.5 A - nominal current) • Setting-up procedure: • Re-matching to regular triplet lattice (relaxed optics, b = 4m) Measured rms normalized emittance: eX = 135  140 p mm mrad eY = 130  200 p mm mrad

  4. CTF3 - Longitudinal beam dynamics issues Transfer Line To CR (TL1) CTF3 Layout Delay Loop Drive Beam Accelerator Stretcher Combiner Ring CLEX locations relevant effects issues/studies codes (presently used) Injector/1st chicane space charge bunching, parasites bunches PARMELA-MATHCAD models Linac Long. Wakes bunch length, energy spread analytical models Stretcher/TL1 CSR bunch compression/lengthening ELEGANT (Frascati) DL & Combiner Ring CSR, impedance longitudinal phase space evolution analytical models

  5. CTF3 - bunch length gymnastics

  6. SR monitors OTR screen RF deflector Spectrometer (OTR screen) bypass BPIs Can be bypassed - Variable R56 - bunch length measurement with vertical RF deflector • Commissioning of INFN beam position monitors (BPI), synchrotron radiation monitors, new instrumentation section. INFN/Frascati chicane magnetic chicane matching triplet instrumentation section matching triplet • Optics studies and measurements: • Dispersion measurements (orbit difference) • Bunch length measurements

  7. Dispersion measurement: • magnet current scaling 1% • orbit difference preliminary • Bunch length measurement: • Vertical deflection in RFD • Measure vertical beam size in OTR (with & without RF) • Change chicane optics – R56 simul. unif. simul. gaussian measured Dispersion & bunch length measurements