2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT FOR THE MONTH OF MAY 2014

Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB ) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul Gani Road, Dhaka-1000, Bangladesh. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT FOR THE MONTH OF MAY 2014.

ondrea
Download Presentation

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT FOR THE MONTH OF MAY 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bangladesh-India Friendship Power Company (Pvt.) Limited(A Joint Venture of NTPC Ltd and BPDB)Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul Gani Road, Dhaka-1000, Bangladesh 2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT FOR THE MONTH OF MAY 2014 Boundary Wall work started at site PROGRESS REPORT-MAY'2014

  2. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT INDEX PROGRESS REPORT-MAY'2014

  3. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT Management Summary • Appointment of Owner’s Engineer: Appointment of M/S Fichtner GmbH as Owner’s Engineer has been approved in 8th Board Meeting. Contract agreement signed on 15th May ‘14. • Appointment of Coal Consultant : Technical Bid opened on 26th May ‘14. • Environment Management: 1st Quarterly monitoring submitted by M/S CEGIS on 11th May. • Boundary wall, Slope protection & Additional area filling: Negotiation held with M/S BDPL. Contract Finalized. Contract agreement signed on 20th May ‘14. • Pre-fabricated Site Office : Technical specification Finalized. • Substation Package: Bid opening on 26th June’14. • Consultancy for Gate Complex: Contract is at finalizing stage. Highlights – Progress: Corporate Activities PROGRESS REPORT-MAY'2014

  4. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT Highlights - Progress : Site Activities • Site filling work completed. Micro-leveling & compaction in progress. • Earthen dyke preparation in progress. • For slope protection work, preparation of profile is in progress. • Material reached site for Boundary Wall work. • Main Plant Fencing work in progress. PROGRESS REPORT-MAY'2014

  5. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT Financial Progress (FY-2013-14) PROGRESS REPORT-MAY'2014

  6. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT Status of Critical Inputs PROGRESS REPORT-MAY'2014

  7. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT Pending Critical Approvals PROGRESS REPORT-MAY'2014

  8. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT Major Initiatives taken during this month • Owner’s Engineer : Contract Agreement signed with Fichtner. • Coal Consultancy: Technical bid opened. • Boundary wall, Slope protection, preparation of Earthen Dyke & Additional Land Filling : Contract Agreement signed with BDPL. • Technical specification of Office Complex finalized. PROGRESS REPORT-MAY'2014

  9. 2X660 MW MAITREE SUPER THERMAL POWER PROJECT Schedule of activities Planned for next six months PROGRESS REPORT-MAY'2014

  10. Bangladesh-India Friendship Power Company (Pvt.) Limited(A Joint Venture of NTPC Ltd and BPDB)Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul Gani Road, Dhaka-1000, Bangladesh • Transformer Erection work in Progress PROGRESS REPORT-MAY'2014

  11. BANGLADESH- INDIA FRIENDSHIP POWER COMPANY (PVT.) LTD. PARTNER IN PROGRESS PARTNER IN PROGRESS PARTNER IN PROGRESS PROGRESS REPORT-MAY'2014