An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MC progress: General • Simulation: • EmC response to m and p — AA, CB, TS, MT m satisfactory, need to be implemented in production version Status report on p • Simulation of d rays in DC — AA, SdA • Need to be implemented in production version • Reconstruction: • Order of hot/dead reversed in DCDELETE — MM, done • HW efficiencies in DCDELETE — SdA, MM, done • Error in s-t relations — AA, SdA, PdS • VTXFIN: Evaluate possibility of dkc update to DBV-16 — MM • 2907 dkc DSTs with DBV < 16: Non-trivial

  2. MC progress: rad stream • Simulation: • a0 BR 10 too high — CB • KSKL resonance shape for f0/a0 — CB, ? • wp0 generator — CB, PG, SG, SM Testing revisions to generator, including GEANFI interface Cross section still to be fixed • Bug in h  p+p-g generator — CdD, FA, CB • To be inserted in production version • h p+p-p0 Dalitz plot slopes to be adjusted as well • Problems concerning DST’s • FILFO/par=1 used when streaming rad DSTs — MM

  3. MC progress: kpm and ksl streams • Simulation: • p and n reversed in KS  pen generator — CB, CG, done • Same decay mode for KS and regenerated KL — CB • Small bug in K0peng generator — CB, CG, done • New generators for radiative K decays — CB, CG • Completely tested, need to be interfaced to GEANFI • K0pmng • K+p+p0g (IB, DE) • K+mng, eng (IB) • K+p0mng, p0eng

  4. Datarec progress: Reconstruction • DC wire sags in tracking code — AA, SdA, MM • dE/dx: applied before streaming/to other streams — MM, VP • Implement in datarec after EVCL • dE/dx: New bank format for DSTs — MM, VP • Add DEID bank to DSTs in place of DEDX

  5. Datarec progress: FILFO • Point-person? (SMu, MM, next week?) • Implement downscale for rejected events • Drop BHABREJ cut • Downscale golden Bhabhas • New tag for radiative Bhabhas — CG, TS

  6. Datarec progress: Streaming • kpm: eliminate old tagging algorithms — VP • kpm: dE/dx based tag — VP • ksl: eliminate KSTAG algorithm — MM • rad: downscaled sample with less stringent cuts — FA, CdD • Ready as standalone A/C module, needs to be fully incorporated in datarec • clb: various bug fixes — TS • lsb: selection/insertion code — MM

  7. Plans, priorities, prerequisites • Re-reconstruct 5-10 pb-1 (LSF = 1:5) of all_phys for tests 1 day • Requires: MC general, Desired: MC kpm • New MC production: radiative f decays, 110M evts 7 days • Requires: MC general, MC rad • New MC production: e+e-g, Eg > 100 MeV, 32M evts 7 days • Requires: MC general • New MC production: all_phys off peak, ~60M evts 7 days • Requires: MC general, MC rad, MC ksl/kpm • Re-run all_phys production 20 days • Requires: MC general, MC rad, MC ksl/kpm • Re-run neu_kaon production 30 days • Requires: MC general, MC ksl/kpm • Reprocess data for FILFO bias sample ? days • Requires: Data streaming

  8. How are we doing on time? • When does data taking restart? • Informal from Sergio: expect data by Easter • … 72 days until Easter • 72 + ? days of planned production • Other requests? • Must get cracking within 0 days! • MC general category highest priority

  9. Organizational issues • Offline shifts: • Tentatively scheduled • If no production next week, will slide back • by one week • Nominations for co-convenor: 0

More Related