1 / 36

POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio

POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio. LOAD DIVERSITY. The unique load curve of different identities due to varied nature of load / requirements results in the overall load diversity. DEMAND ESTIMATION. Availability = Own Generation

pegeen
Download Presentation

POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio

  2. LOAD DIVERSITY The unique load curve of different identities due to varied nature of load / requirements results in the overall load diversity.

  3. DEMAND ESTIMATION Availability = Own Generation (+) Entitlement from Grid (+) Bilaterals

  4. ENTITLEMENTS = Fixed Shares + Unallocated Shares

  5. FIXED SHARES Allocation to States from the Central Sector Stations in terms of Percentages which generally remain fixed. UNALLOCATED SHARES Allocation to States from Central Sector Stations in terms of Percentages which are changed on seasonal basis and / or under typical conditions as decided by Govt. of India.

  6. 3rd J A N U A R Y 2 0 0 4

  7. Inter Regional HVDC Links HCDC Vindhyachal B-B HCDC Sasaram B-B HCDC Chandrapur B-B HCDC Gazuaka B-B HCDC Talcher Kolar

  8. NR BILATERAL AGREEMENTS

  9. Thank You

More Related