1 / 19

Facility Advisory Committee Meeting January 23, 2019

Facility Advisory Committee Meeting January 23, 2019. Thank You for Being Here -- Your Input is Valuable to Us!. Facility Advisory Committee Meeting January 23, 2019. Facility Advisory Committee

prager
Download Presentation

Facility Advisory Committee Meeting January 23, 2019

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Facility Advisory Committee Meeting January 23, 2019 • Thank You for Being Here -- Your Input is Valuable to Us!

  2. Facility Advisory Committee Meeting January 23, 2019 • Facility Advisory Committee • Composition: Ad hoc Group of Citizens’ Bond Oversight Committee Members and Various Stakeholders from the Community and District • Purpose: Review Bond Program Projects Completed to Date, Projects in Design and Future Projects • Goal: Provide Input and Recommended Adjustments to Bond Program; Based on Changing Priorities

  3. Facility Advisory Committee Meeting January 23, 2019 • Measure B Projects to Date • 2017 Projects Completed (Division of the State Architect (DSA) Not Required) • BRHS/NUHS:Replace Head End Public Address System • BRHS:Fires Shutters Addition (Ag Mechanical & Woodworking) • BRHS/NUHS/SSHS:Security Camera System (New & Upgrades) • NUHS: Replacement of Underground Gas Lines • NUHS: Replacement of All-Weather Synthetic Turf at Stadium • NUHS: Replacement of Roofing at Bldgs. C, J, E & Theatre Complex • NUHS: Stucco Repair & Exterior Painting at Don Baggett Theatre • NUHS: Remove & Dispose of Two Decrepit Portable Buildings

  4. Facility Advisory Committee Meeting January 23, 2019 • Measure B Projects to Date • 2018 Projects Completed (DSA Review Required) • NUHS: Underground Utilities Replacement, ADA Improvements, Parking Lot Paving • BRHS: New All-Weather Track, Site Work (Track Sub-Base Preparation / Drainage); ADA Parking & Path of Travel Improvements • BRHS: Administration Bldg. HVAC Replacement, ADA Restroom Improvements (Bldg. A & MPR) , Elevator ADA Upgrades • SSHS: New Student Courtyard at Main School Entry, ADA Parking & Path of Travel Improvements, Parking Lot Paving • NUHS: Pool House Modernization (Complete Renovation), Boiler / Piping Replacement. Currently under construction

  5. REVIEW OF POTENTIAL PROJECTS • List of Remaining Projects by Site • Bear River High School • Nevada Union High School • Silver Springs High School

  6. POTENTIAL PROJECTS BEAR RIVER HIGH SCHOOL • 1 Multipurpose/Fine Arts$ 1HVAC Upgrades, Kitchen Modernization • 2 McCrory Gymnasium$ 1 • Add AC, Public Restroom Addition • 3 Sports Complex Improvements$ 1Upgrade joint use parking, POT Improvements • 4 Re-Purpose Woodshop into Classroom$ 1 • Modernization • 5 Propane Site Distribution$ 1 • Boring to extend pipe to main propane tank • 6 Performing Arts Building Toilet Room$ 1 • Add Toilet Room at Green Room backstage • PROJECTS ALREADY UNDERWAY • 1 C–Wing HVAC Upgrades $ 8,500,000 • D-Wing Ag Mech CTE Modernization

  7. Bear River High School • NON DSA PROJECTS • PERFORMED DIRECTLY BY DISTRICT • A Repair Storm Drainage System$ 1Corrugated Metal Pipe Failure • B Building G Relocatable Repair$ 1 • Replace Wood Siding • C McCrory Gymnasium$ 1Refinish Maple Floor • D Buildings A thru E – Exterior Maintenance$ 1 • Clean/Waterseal existing brick veneer • E Building A – Science/Biology Classrooms$ 1 • New Laminate Tops, Replace Ceiling Tile, Painting

  8. POTENTIAL PROJECTS NEVADA UNION HIGH SCHOOL • 1 Albert Ali Gymnasium $ 1 • HVAC Upgrades, Add AC • 2 Music Building Modernization $ 1Band and Choir Rooms, Accessibility Issues • 3 Administration Building Reconfiguration $ 1 • Mental Heath, Special Ed, Student Store • 4 West Gymnasium $ 1 • HVAC Upgrades, Add AC, Replace Maple Floor • 5 Buildings J & S Stair & Elevator Issues $ 1 • Replace damaged Stairway, Add Guardrail • 6 New Shade Structure $ 1 • Location east of Building E • 7 Sports Complex Improvements $ 1 • New Pedestrian Entry, POT to Seating, Bleachers • 8 Don Baggett Theatre – Accessibility Upgrades $ 1 • Parking, POT – multiple locations, Toilet Rooms • 9 Fire Alarm Replacement $ 1 • Campus Wide System Upgrade

  9. Nevada Union High School • PROJECTS ALREADY UNDERWAY • Phase II – Paving & Accessibility Work $ 3,028,603 • F Wing Ag Mech CTE Modernization $ 3,609,174 • Pool House Modernization $ 2,698,655 • CTE – New Culinary Arts Classroom $ 1 • Re Purpose Drafting Room at IA Building • NON DSA PROJECTS • PERFORMED DIRECTLY BY DISTRICT • A Exterior Painting $ 1All Buildings Except Baggett Theatre • B Building G Locker Rooms $ 1 • Interior Painting • C Tennis Courts $ 1Resurface Playing Surface, Repair bollards • D Albert Ali Gymnasium $ 1 • Refinish Maple Floor • E Science Lecture Hall $ 1 • Carpet Replacement, Painting • F Site Plumbing Repairs $ 1 • Allowance for General Repairs

  10. POTENTIAL PROJECTS SILVER SPRINGS HIGH SCHOOL • 1 CTE – Construction Technology $ 1Remodel of existing Industrial Arts Building • 2 Administration Area Reconfiguration $ 1 • Mental Health, Staff Area, Toilet Rooms • 3 Gymnasium $ 1 • HVAC Upgrades, Add AC, Replace Maple Floor • 4 Lower Floor Alterations $ 1 • HVAC, Kitchen Modernization, Weight Rooms • 5 Fire Alarm System Replacement $ 1 • Campus Wide System Upgrade • 6 PA/Clock/Intercom Replacement $ 1 • Campus Wide System Upgrade • 7 Window Replacement $ 1 • Complete replacement of single pane windows

  11. Silver Springs High School • NON DSA PROJECTS • PERFORMED DIRECTLY BY DISTRICT • A Exterior Painting $ 1Full Building • B Site Plumbing Repair $ 1 • Replace 3” Water Line • C Security Camera Installation $ 1Refinish Maple Floor

  12. Facility Advisory Committee Meeting January 23, 2019 • Challenges Facing the District • Construction Costs Rising Dramatically • Financing Strategies • Limited Pool of Bidders • Public/Private Construction Demand is High While Labor Pool is Low • Public Works Projects = Extensive Documentation • Requirement to be Pre-Qualified = Close Scrutiny of Contractor Finances • Constant Need for Improvements Driven by Aging Facilities and Infrastructure • Education and Student Service Needs Increasing/Changing

  13. Facility Advisory Committee Meeting January 23, 2019 • Previous Recommendations • Periodic Program Review ~ Every 2 Years • Continue to Maintain a Transparent and Accountable Process • Seek Stakeholder Input • Continue to Move Forward with Construction of 2019 Projects in Design • Adjustments • Delay BRHS Solar Projects / Seek Alternative Methods to Implement/ Seek to Fund Other Priorities First • Implement Targeted HVAC Upgrades at NUHS • Create Flexible Learning Environments • NUHS/BRHS Technology Infrastructure Upgrades (Matched with E-Rate Funds) • Flexibility to Address Other Urgent Needs / Miscellaneous • Example: BRHS Stadium Scoreboard May Need to Be Replaced

  14. Thank you for giving your valuable time to this most important effort!

More Related