An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DAQ and ECS system for TPC commissioning at Point 2 Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 22 November 2005

  2. Hardware installed RCU RCU RCU RCU PC SIU SIU SIU SIU SXL2 PC RCU RCU • 20 fibers tested: - Round-trip att. < 4 dB- one way 176 metres SIU SIU (Control) HLT Farm PX24/CR2 General Purpose Network (GPN) 4 x DRORC 2 x DRORC DRORC LDC LDC LDC Event Building Network (Gigabit Ethernet) PX24/CR1 Server GDC Gateway (DATE, ECS) TDS 2 TB Disk array (RAID 5) ALICE TPC meeting, 22 November 2005

  3. Software installed • Scientific Linux CERN (SLC3) • Kernel, drivers, services, accounts, … • DAQ software: DATE V5.12 • DDL readout with CDH processing (event ID, SOD/EOD events) • RCU control/configuration via DDL (FeC2 scripts) • Sub event-building (LDC), full event-building (GDC) • HLT interplay (copy data stream, handle decision/data stream) • Recording to local storage (support for raw and ROOT format) • Configuration via database, message logging, … • Experiment Control System (ECS) • Required for combined run with ≥2 systems (TRG, DAQ, DCS, HLT) • On-line Monitoring • Performance with the web-based tool AFFAIR • Data quality with the pad monitor MOOD the decoder can handle RCU zero-suppressed data files • User’s guide • Complete documentation for DATE, ECS, AFFAIR, MOOD • TPC contact person for the DAQ? ALICE TPC meeting, 22 November 2005

  4. PX24/CR1 DDL patch panel PDU Switch LDCs GDC Storage Gateway Server ALICE TPC meeting, 22 November 2005