E N D
PT INDO TRANS KONSTRUKSI Document No : 01/ITP/ACT-ITK/22 INSPECTION TESTING PLAN PROJECT : PENSTOCK ACSET INSPECTION AND TEST PLAN FABRICATION & INSTALLATION Approval Sheet Title Name Date Signature Revision Status Rev Issue Date Prepared Checked Approved Issue Purpose Owner Signature 01 Januari 2022 0 Issue for Approval
PT INDO TRANS KONSTRUKSI ITP – PLTM BESAI KEMU Legend : INSPECTION TEST PLAN M : Monitor P : Perform PENSTOCK PIPE FABRICATION AND INSTALATION A : Approve R : Review W : Witness H : Hold Point Doc. No. : 01/ITP/ACST-ITK/22 Level Inspection Remark No Work Activities Reference Document Verified Documents Acceptance Criteria ITK QA/QC ACSET 1 DOCUMENT REVIEW AND APPROVAL AFC Drawing Approval Drawing Shop Drawing 1.1 Shop Drawing P R/A Fabrication Procedure; Code/Standard Fabrication Procedure Relevant specification 1.2 Fabrication Procedure P R/A Hidro Testing Procedure; ASME B31.3 Par.345.1 ASME Sec. IX, Art-2 ASME B31.3, P.328.2 Hidro Testing Procedure Hidro Testing Procedure 1.3 Hidro Testing Procedure P R/A ASME B31.3 ASME Sec IX ASME B31.3 ASME Sec IX ASME Section V ASME B31.3 WPS/PQR Register 1.4 WPS/PQR P R/A ASME Sec. IX, Art-3 ASME B31.3, P.328.2 Welder Certificate Register Welder Performance Qualification Test 1.5 P R/A Approval General Piping NDT Procedure ASME B31.3; Table 341.3.2 1.6 NDT Procedure P R/A Specification for Protection Coatings Non Conformance Procedure Specification for Protection Coatings Non Conformance Procedure - 1.9 Painting Procedure P R/A 1.10 Non Conformance Procedure Approval Procedure P R/A ___________________________________________________________________________________________________________________________________________________________________________________ 01/ITP/ACST-ITK/22 Rev. 0
PT INDO TRANS KONSTRUKSI ITP – PLTM BESAI KEMU Legend : INSPECTION TEST PLAN M : Monitor P : Perform PENSTOCK PIPE FABRICATION AND INSTALATION A : Approve R : Review W : Witness H : Hold Point Doc. No. : 01/ITP/ACST-ITK/22 Level Inspection Remark No Work Activities Reference Document Verified Documents Acceptance Criteria ITK QA/QC ACSET 2 MATERIAL Data Sheet; Drawing; ASTM Material. Material Certificate Register Material Certificate 2.1 Review Material Certificate P R Material Receiving Report Material Specification; ASME B31.3 Par-323.1 2.2 Material Inspection & Verification P W 3 FABRICATION AFC Drawing 3.1 Marking and cutting Cutting Report AFC Drawing, P M AFC Drawing ASME B31.3 Approved WPS ASME B31.3 Approved WPS ASME Sec. IX AFC Drawing, ASME B31.3 Par.332.1 Approved WPS; ASME B31.3,Par.328.4 Approved WPS; ASME Sec IX, Artikel-3 3.2 Bending or Forming (if any) Dimensional Report P M 3.3 Surface Preparation and Fit-Up Welding Report P M 3.4 Check qualified welder / operator Welding Report P M 4 VISUAL INSPECTION / DIMENSIONAL CHECK Piping Fabrication ASME B31.3 Piping Fabrication ASME B31.3 Approved Drawing ASME B31.3 ASME B31.3 T.341.3.2 4.1 Weld visual check Visual Report P W Visual Report; NDT Report Temporary Attachment (tack weld) ASME B31.3 T.341.3.2 4.2 P W Traceability Report ASME B31.3 T.341.3.2 4.3 Identification Weld P W ___________________________________________________________________________________________________________________________________________________________________________________ 01/ITP/ACST-ITK/22 Rev. 0
PT INDO TRANS KONSTRUKSI ITP – PLTM BESAI KEMU Legend : INSPECTION TEST PLAN M : Monitor P : Perform PENSTOCK PIPE FABRICATION AND INSTALATION A : Approve R : Review W : Witness H : Hold Point Doc. No. : 01/ITP/ACST-ITK/22 Level Inspection Remark No Work Activities Reference Document Verified Documents Acceptance Criteria ITK QA/QC ACSET 5 NDT UT Procedure; ASME SEC V General Piping NDT Procedure UT Report ASME B31.3, T.341.3.2 5.1 Ultrasonic Test P W Welding Completion Summary General Piping NDT Procedure 5.2 NDT Clearance P R 6 Pressure Testing Piping Pressure Testing Procedure ASME B31.3 Par.345.4 Hydro Testing Procedure. ASME B31.3 Piping Completion (MP1) 6.1 Hydro Testing P H 7 PAINTING Specification for Protection Coatings Specification for Protection Coatings Specification for Protection Coatings Specification for Protection Coatings Blasting Report 7.1 Blasting P W Visual inspection of surface preparation Painting Report 7.2 P W Painting Report Final Paint Completion (AS1) Specification for Protection Coatings Specification for Protection Coatings 7.3 Dry film thickness check P W 8 HANDOVER Handover System & Certification Manual Final Inspection prior delivery/ shipment Complete Testing Report 8.3 IRN P A ___________________________________________________________________________________________________________________________________________________________________________________ 01/ITP/ACST-ITK/22 Rev. 0
PT INDO TRANS KONSTRUKSI ITP – PLTM BESAI KEMU Legend : INSPECTION TEST PLAN PENSTOCK PIPE INSTALATION M : Monitor P : Perform A : Approve R : Review W : Witness H : Hold Point Doc. No. : 02/ITP/ACST-ITK/22 Level Inspection No Work Activities Reference Document Verified Documents Acceptance Criteria Remark ITK QA/QC ACSET OPS 1 DOCUMENT REVIEW Material/Equipment Standart Spesification As per Contract 1.1 Certificate Certificate P R - - Approved Procedure 1.2 Installation Procedure Instalation Methode Approval Procedure P R R R Approved Procedure ASME B 31.3 Piping Pressure Testing Procedure 1.3 Hydro Testing Procedure Approval Procedure P R R R AFC Drawing 1.4 Drawings AFC Drawings Approval Drawing P R R R Procedure UT Standart ASME Sec V 1.5 NDE UT Procedure Approval Procedure P R R R 2 INSTALLATION PROCESS Erection Drawing Installation Procedures AFC Drawing Welding Standart Erection Drawing Installation Procedures AFC Drawing ASME Sec. VIII Visual Report 2.1 Dimensional Check P W - - Flange Joint Report Torque Wrench Report 2.2 Welding Joint P W R - 3 COMMISSIONING AND TESTING Joint Integrity Certificate (JI1) AFC Drawing 3.1 Joint Inspection AFC Drawing P W W W Joint Integrity Testing Procedure Drawing/Installation Procedures 3.2 Re – Instatement Visual Report P W W W ___________________________________________________________________________________________________________________________________________________________________________________ 01/ITP/ACST-ITK/22 Rev. 0
PT INDO TRANS KONSTRUKSI ITP – PLTM BESAI KEMU Legend : INSPECTION TEST PLAN PENSTOCK PIPE INSTALATION M : Monitor P : Perform A : Approve R : Review W : Witness H : Hold Point Doc. No. : 02/ITP/ACST-ITK/22 Level Inspection No Work Activities Reference Document Verified Documents Acceptance Criteria Remark ITK QA/QC ACSET OPS Installation Procedure 4 PAINTING Painting Report Final Paint Completion (AS1) Painting Report Final Paint Completion (AS1) Specification for Protection Coatings Specification for Protection Coatings 4.1 Cleaning Power tools (SP – 3) P M R R Specification for Protection Coatings Painting Procedure 4.2 Finish Painting P M R R 5 HANDOVER Non Conformance Procedure Repair Record Document Procedure 6.1 NCR (Non Conformance Report) NCR NCR Close P A R R Approved Repair Dossier 6.2 Handover Process Repair Dosier P R/A A A ___________________________________________________________________________________________________________________________________________________________________________________ 01/ITP/ACST-ITK/22 Rev. 0