NATIONAL ENERGY CONSERVATION AWARD 2007

NATIONAL ENERGY CONSERVATION AWARD 2007. PRESENTED BY : A.GANESAN EXECUTIVE ENGINEER (E) BSNL ELECTRICAL DIVISION MADURAI. THE BUREAU OF ENERGY EFFICIENCY HAS ANNOUNCED NATIONAL ENERGY CONSERVATION AWARD 2007. CTO BDLG. MADURAI.

wirt
Download Presentation

NATIONAL ENERGY CONSERVATION AWARD 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATIONAL ENERGY CONSERVATION AWARD 2007

  2. PRESENTED BY : • A.GANESAN • EXECUTIVE ENGINEER (E) • BSNL ELECTRICAL DIVISION • MADURAI

  3. THE BUREAU OF ENERGY EFFICIENCY HAS ANNOUNCED NATIONAL ENERGY CONSERVATION AWARD 2007

  4. CTO BDLG. MADURAI CTO BUILDING MADURAI IS ONE OF THE TWO BUILDINGS SELECTED BY THE PCE(E) FOR NOMINATION TO THE AWARD

  5. BUILDING PROFILE CTO COMPLEX IS COMPRISING OF THREE BLOCKS

  6. BUILDING PROFILE

  7. BUILDING PROFILE

  8. BUILDING PROFILE

  9. ENERGY CONSUMPTION CHART

  10. CONSUMPTION PATTERN

  11. REDUCTION IN SPECIFIC ENERGY CONSUMPTION AS A RESULT OF VARIOUS ENERGY CONSERVATION MEASURES ADOPTED THE ENERGY EXPENDITURE HAS COME DOWN DESPITE INCREASE IN CONNECTED LOAD

  12. CTO BUILDING - MADURAI ON THE BASIS OF THE ACHIEVEMENTS OF VARIOUS ENERGY CONSERVATION MEASURES ADOPTED, THIS BUILDING HAS BEEN SELECTED FOR THE CONTEST

  13. MAJOR ENERGY SAVING MEASURES ADOPTED

  14. REPLACEMENT OF AC UNITS OLD UNIT REPLACED BY NEW S/T AC UNIT

  15. REPLACEMENT OF AC UNITS • 54 NOS. OUTLIVED A/C UNITS UNITS HAVE BEEN REPLACED BY 34 NOS NEW S/T A/C UNITS RESULTING IN A SAVING OF RS.8,99,360/- PER YEAR.

  16. REPLACEMENT OF AC UNITS

  17. REPLACEMENT OF CONVENTIONAL POWER PLANT WITH SMPS POWER PLANT

  18. REPLACEMENT OF CONVENTIONAL POWER PLANT WITH SMPS POWER PLANT • THE EXISTING CONVENTIONAL TYPE POWER PLANT HAS BEEN REPLACED WITH SMPS POWER PLANT RESULTING IN A SAVING OF RS.62,550/- PER YEAR

  19. REPLACEMENT OF CONVENTIONAL POWER PLANT WITH SMPS POWER PLANT

  20. REPLACEMENT OF DEFECTIVE CAPACITORS

  21. REPLACEMENT OF DEFECTIVE CAPACITORS • THE DEFECTIVE CAPACITORS IN THE POWER FACTOR IMPROVEMENT PANEL HAVE BEEN REPLACED RESULTING IN A SAVING OF RS. 30,799/- PER YEAR. POWER FACTOR ALWAYS > 0.98

  22. REPLACEMENT OF PACKAGE AC UNITS 4+2 X 7 TR REPLACED WITH 3+1 X 7 TR

  23. REPLACEMENT OF PACKAGE AC UNITS • THE EXISTING 4+2 X 7 TR PACKAGE AC PLANT HAS BEEN REPLACED WITH 3+1 X 7 TR PACKAGE AC PLANT RESULTING IN A SAVING OF RS.1028500/- OLD NEW EXPENDITURE

  24. REPLACEMENT OF PACKAGE AC UNITS

  25. PROPOSED ENERGY SAVING MEASURES IN 2007-08 • 1. CHANGE OF EB TARIFF OF 21 NOS S/Q • 2. REPLACEMENT OF FL. FITTINGS WITH ENERGY EFFICIENT FITTINGS • 3.PROVISION OF WATER LEVEL CONTROLLER FOR PUMPS • 4. CREATING AWARENESS AMONG STAFF BY CONDUCTING PROGRAMMES & THROUGH SLOGANS

  26. CHANGE OF EB TARIFF OF S/Q • AT PRESENT 21 NOS S/Q ARE BEING FED FROM SUB STATION & ENERGY COST IS RS.5/- PER UNIT • ALL ELECTRICAL WORKS FOR GETTING SEPARATE SERVICE CONNECTION FOR S/Q ARE COMPLETED • WHEN SERVICE CONNECTION WITH RESIDENTIAL TARIFF IS EFFECTED THERE WILL BE A BI-MONTHLY SAVING OF RS 14,700/- • [ 21 S/Q X (RS 5 - RS 2.8) X 250 UNITS ]

  27. WATER LEVEL CONTROLLER FOR PUMPS • NEARLY 225 EMPLOYEES ARE WORKING & 13 NOS PUMPS ARE AVAILABLE • ALL THE PUMPS ARE BEING OPERATED MANUALLY • THERE IS A GOOD SAVING POTENTIAL BY PROVIDING WATER LEVEL CONTROLLER FOR THE PUMPS

  28. INSTALLATION OF ENERGY EFFICIENT LIGHT FITTINGS • 598 NOS TWIN FITTINGS & 316 NOS SINGLE FLUORESCENT TUBE LIGHT FITTINGS ARE AVAILABLE • CONNECTED LOAD OF THESE FITTINGS WORKS OUT TO 60 KW • IT HAS BEEN PROPOSED TO REPLACE THE ABOVE WITH ENERGY EFFICIENT FITTINGS IN A PHASED MANNER • ON COMPLETION OF THE TASK THERE WILL BE A REDUCTION OF 18 KW OF LOAD

  29. AWARENESSPROGRAMME • ENERGY CONSERVATION AWARENESS WILL BE CREATED THROUGH PROGRAMMES AND SLOGAN STICKERS

  30. APPLICATION SENT • IN VIEW OF THE ABOVE MEASURES & ACHIEVEMENTS & AS PER THE INSTRUCTIONS OF THE PCE(E) & SE(E), APPLICATION FOR THE ENERGY CONSERVATION AWARD HAS BEEN SENT TO BUREAU OF ENERGY EFFICIENCY

  31. WE HOPE THAT CTO COMPLEX MADURAI WILL RECEIVE THE ENERGY CONSERVATION AWARD FROM BUREAU OF ENERGY EFFICIENCY

  32. THANK YOU