1 / 1

Traffic Engineering Survey City of Rancho Palos Verdes

N. Segment Limit. n.t.s. 45. 45. 40. 45. 45. 45. 45. 45. 45. 45. STOP. STOP. STOP. STOP. STOP. STOP. STOP. STOP. STOP. STREET: PVDS. Traffic Engineering Survey City of Rancho Palos Verdes. LIMITS: PVDW TO 1,500 FT E/O OF SEACOVE DR. DATE: 6-14-06. ENGINEER: JACK RYDELL.

yeva
Download Presentation

Traffic Engineering Survey City of Rancho Palos Verdes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. N Segment Limit n.t.s. 45 45 40 45 45 45 45 45 45 45 STOP STOP STOP STOP STOP STOP STOP STOP STOP STREET: PVDS Traffic Engineering Survey City of Rancho Palos Verdes LIMITS: PVDW TO 1,500 FT E/O OF SEACOVE DR DATE: 6-14-06 ENGINEER: JACK RYDELL SIGNATURE: MAP SYMBOLS R-1 STOP SIGN Segment Limit R-2 SPEED LIMIT Crestmont Ln Seacove Dr BUS STOP Barkentine Rd 40 Seahill Dr SCENIC TURN-OUT Seawolf Dr Long’s Point Lighthouse/PVIC Access 1.8 MILES DISTANCE Rolling with horizontal curves ALIGNMENT PARKING RESTRICTIONS Parking prohibited on both sides The EB barrel varies from 25-55’ in width. The WB barrel varies from 30-50’ in width STREET WIDTH 2 thru lanes in each direction – raised median – openings at intersections and some midblock locations – continuous bike lane or route in both directions NO. OF LANES AND MEDIAN IMPROVEMENTS (SW, C & G) WB barrel: N/S continuous concrete curb and gutter, intermittent dirt path, S/S continuous concrete curb and intermittent gutter. EB barrel: S/S continuous concrete or AC sidewalk or dirt path. N/S continuous concrete curb and gutter Backup residential. A few private driveways. Two scenic turn outs FRONTING DEVELOPMENT 8,000 as of 5-17-06 AVERAGE DAILY TRAFFIC 5-31-06 Crestmont Lane SPEED CHECK DATA (DATE/LOC) AVERAGE SPEED: 47 MPH CRITICAL SPEED: 52 MPH 10 MILE PACE: 41 - 50 MPH TOTAL MIDBLOCK ACC: 8 NO. W/SPEEDING: 2 PREDOMINATE: UNSAFE TURN MOVEMENT HBD, DRUNK, H&R: 1 2-YEAR ACCIDENT DATA THRU 4-06 ACCIDENT RATE: 0.76 ACCIDENTS PER MILLION VEHICLE MILES DISTRICT 7 AVERAGE: 1.76 ACCIDENTS PER MILLION VEHICLE MILES EXISTING SPEED ZONE – 45 MPH PROPOSED SPEED ZONE – 45 MPH This portion of roadway is heavily used by bicyclists creating the potential for significant conflict with vehicles traveling at relatively high speeds. Additionally, the horizontal and vertical curves in the alignment limit visibility for vehicles exiting side streets and driveways onto PVDS. The speed limit on the adjacent roadway (PVDW) is posted at 45 mph. Considering these factors and CVC Section 627, which specifies that bicyclist safety be considered in an Engineering and Traffic Survey, it is appropriate to apply a 5 mph reduction from the 85th percentile speed in order to establish a reasonable and safe speed limit. COMMENTS ATTACHMENT B

More Related