Phase 1 - TO and Drawing Review, Database Development, Test Requirement Development 124 Air Force Technical Orders Revie

Program established to assist United States Air Force (Airborne Accessories Directorate) in development and implementation of replacement repair and overhaul procedures for hydraulic actuators across multiple weapon systems.

zenobia
Download Presentation

Phase 1 - TO and Drawing Review, Database Development, Test Requirement Development 124 Air Force Technical Orders Revie

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Program established to assist United States Air Force (Airborne Accessories Directorate) in development and implementation of replacement repair and overhaul procedures for hydraulic actuators across multiple weapon systems.

  2. Phase 1 - TO and Drawing Review, Database Development, Test Requirement Development • 124 Air Force Technical Orders Reviewed • 100% complete • 409 Engineering Drawings Reviewed • 34.8% complete • 251 Chrome plated parts and 288 additional potentially chrome plated parts have been identified.

  3. Phase 2 - Material, Rig, and Flight Testing • Flight Control Actuators • 6 candidate items selected • 4 OEMs (Parker, Lockheed, Dowty, Boeing) • Utility Actuators • Still being evaluated

  4. Phase 2 - Material, Rig, and Flight Testing • Fatigue failures of B-1 Horizontal Stabilizer Actuator Forward Piston have occurred • Boeing has developed a new design for the Horizontal Stabilizer Actuator Forward Piston • Functional and life cycle testing on the new actuator piston design is required • HVOF coatings will be used in lieu of chrome plate on rod and head ODs of Forward and Aft Piston test articles • Forward piston fatigue and actuator endurance spectra will be developed as the project proceeds

  5. Phase 2 - Material, Rig, and Flight Testing

  6. Phase 3 - Test Evaluation • Results of Testing will be evaluated and a solution finalized.

  7. Phase 4 - Implementation • The solution developed in Evaluation will be implemented.