How BIM Helps in Project Management

It helps architects, engineers, and constructors visualize what is to be built in a simulated environment to identify any potential design, construction, or operational issues. BIM represents a new paradigm within AEC, one that encourages the integration of the roles of all stakeholders on a project.<br><br>For more information about BIM Implementation for Project management, visit our website: www.topbimcompany.com

Alishna
Download Presentation

How BIM Helps in Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIM H E L P S P R O J E C T M A N A G E M E N T? H O W

  2. What is BIM in Construction Project Management? The method of constructing 3D models with a collection of information is known as building information modeling. Building Information Modeling (BIM) is crucial for project management and technical aspect control throughout the different stages of work, in addition to being helpful for implementing model with data. In actuality, you may identify and arrange maintenance operations even before the design phase due to the abundance of information accessible. In fact, you may quickly discover any interference in the execution phase and find remedies, reducing resource waste.

  3. How is BIM Integrated into Project Management? Enables better administration through the sharing of information in the cloud Usage of BIM for project management software enables this. With this tool, engineers organize the folders within the CDE (Common Data Environment), highlighting all activities, execution times and expenses

  4. Using Cloud Eco-System Using the capability of cloud eco- system, all managers’ activities and expenses are documented and shared, creating a schedule. By contrasting this with project planning, a helpful dynamic comparison is made to ensure that the usage of resources is always kept in check. The project manager can more easily direct and supervise the work of numerous teams because it is simple to communicate all information and keep track of all activities. The process is accelerated and made more organized in this way, which has the benefit of reducing errors.

  5. Top 12 Benefits of BIM for Project Management Improved collaboration Integrated BIM dimensions Decreased construction cost Reduced delivery time Complete project visualization Enhanced project quality Immediate availability of information model Increased productivity Efficient planning of activity No duplicate file Clash detection Better project management

  6. 1. Improve Collaboration Compared to conventional techniques BIM make it easier to interact and communicate with your team It is made feasible by various tools that let you see changes as they happen

  7. 2. Decreased Construction Cost Errors that are typically discovered during the execution phase can be eliminated at the design phase. This results in a decrease in the resource utilized and, consequently, the expenditures related to them.

  8. 3. Complete Project Visualization All participants can view the entire model in all components to get a full picture before the work is fully completed: Structural BIM Model MEP Model Architectural BIM Model

  9. Increased Productivity 4. Each participant involved is well informed of what to do, delivery times, operating methods for improving results

  10. 5. Efficient Planning of Activity The planning of many activities optimizes how labor is organized

  11. 6. Clash Detection Federation of models from several disciplines (architectural, structural, MEP) make it simple to spot interference (overlap between window and pillar)

  12. 7. Integrated BIM Dimensions The model is utilized for cost analysis (5D), time organization (4D), and other purpose in addition to geometric properties (3D).

  13. 8. Reduced Delivery Time The preparation for the documents are shortened thanks to the optimization of all operations

  14. 9. Enhanced Project Quality Greater arrangement of work (both in decision-making phase and in executive phase) leads to more structured models and easy management

  15. Immediate Availability of Information Model 10. Information models are immediately available, due to the utilization of cloud technologies

  16. 11. No Duplicate File "Unique" models exist. In this procedure, files have several versions that are viewable and accessible as needed

  17. Better Project Management 12. Models are arranged in accordance with what has been discussed by project manager, making them easier to understand & analyze

  18. CONSULT US: 240-899-7711 info@topbimcompany.com www.topbimcompany.com